
37
5.1 Outline drawing of refrigerant piping.
WARNING
All the welding operations on the AWS – GHP refrigerant gas piping must be always performed in
accordance with instructions and prescriptions mentioned in the AISIN GHP installation manual
(brazing with nitrogen flow).
Failure to observe this prescription makes the warranty no longer valid and could result in malfunction
and/or damage to the YOSHI AWS unit.
5 Refrigerant piping
Summary of Contents for YOSHI AWS E1J TWIN
Page 2: ......
Page 16: ...16 7 2 Schema dettagliato dei collegamenti elettrici Deutsch ...
Page 22: ...22 11 4Centrale termo frigorifera AWS E1J TWIN ...
Page 23: ...23 11 5 Centrale termo frigorifera AWS E1J TWIN contabilizzazione consumi Deutsch ...
Page 42: ...42 7 2 Detailed wiring diagram ...
Page 48: ...48 11 4 HVAC installation AWS E1J TWIN ...
Page 49: ...49 11 5 HVAC installation E1J TWIN proportional distribution of consumption ...
Page 50: ...50 11 6 HVAC installation AWS E1J TWIN variable flow rate no hydraulic separator AHU ...
Page 51: ...51 11 7 HVAC installation AWS E1J TWIN variable flow rate with hydraulic separator fan coil ...
Page 56: ...56 NOTE ...
Page 57: ...57 ...
Page 58: ...58 ...
Page 59: ......
Page 60: ...22 08 2013 ...