![Airwell YBZ214 Service Manual Download Page 54](http://html1.mh-extra.com/html/airwell/ybz214/ybz214_service-manual_2879932054.webp)
TROUBLESHOOTING
Service Manual – YBZ DCI 1-A.1 GB
13-1
13.
TROUBLESHOOTING
13.1
ELECTRICAL & CONTROL TROUBLESHOOTING
13.1.1
Precautions before Performing Inspection or Repair
Be cautious during installation and maintenance. Do operation following the regulations to
avoid electric shock and casualty or even death due to drop from high attitude.
*
Static maintenance
is the maintenance during de-energization of the air conditioner.
For static maintenance, make sure that the unit is de-energized and the plug is disconnected.
*
Dynamic maintenance
is the maintenance during energization of the unit. Before dynamic
maintenance, check the electricity and ensure that there is ground wire on the site. Check if
there is electricity on the housing and connection copper pipe of the air conditioner with voltage
tester. After ensure insulation place and the safety, the maintenance can be performed.
Take sufficient care to avoid directly touching any of the circuit parts without first turning off the
power. At time such as when the circuit board is to be replaced, place the circuit board
assembly in a vertical position. Normally, diagnose troubles according to the trouble diagnosis
procedure as described below.(Refer to the check points in servicing written on the wiring
diagrams attached to the indoor/outdoor units.)
Precautions when inspecting the control section of the outdoor unit
:
A large-capacity electrolytic capacitor is used in the outdoor unit controller (inverter).Therefore,
if the power supply is turned off, charge(charging voltage DC280V to 380V)remains and
discharging takes a lot of time. After turning off the power source, if touching the charging
section before discharging, an electrical shock may be caused.
The outdoor unit can not be started up until the unit is de-energized for 20min
13.1.2 Confirmation
13.1.2.1 Confirmation of Power Supply Confirm that the power breaker operates(ON)
normally;
13.1.2.2 Confirmation of Power Voltage Confirm that power voltage is AC220~240V +/-
10%. If power voltage is not in this range, the unit may not operate normally.
Summary of Contents for YBZ214
Page 16: ...OUTLINE DIMENSION 4 2 Service Manual YBZ DCI 1 A 1 GB 4 2 Indoor HZD018 HYD018...
Page 17: ...OUTLINE DIMENSION Service Manual YBZ DCI 1 A 1 GB 4 3 4 3 Outdoor YBZ214...
Page 18: ...OUTLINE DIMENSION 4 4 Service Manual YBZ DCI 1 A 1 GB 4 4 Outdoor YBZ318 YBZ430...
Page 35: ...WIRING DIAGRAM 9 2 Service Manual YBZ DCI 1 A 1 GB 9 3 YAZ214...
Page 36: ...WIRING DIAGRAM Service Manual YBZ DCI 1 A 1 GB 9 3 9 4 YAZ318...
Page 37: ...WIRING DIAGRAM 9 4 Service Manual YBZ DCI 1 A 1 GB 9 5 YAZ430...
Page 38: ...WIRING DIAGRAM Service Manual YBZ DCI 1 A 1 GB 9 5 9 6 Wiring connection between IDU and ODU...
Page 39: ...WIRING DIAGRAM Service Manual YBZ DCI 1 A 1 GB 10 1 10 REFRIGERATION DIAGRAMS...
Page 40: ...TUBING CONNECTIONS Service Manual YBZ DCI 1 A 1 GB 11 1 11 TUBING CONNECTIONS...
Page 76: ...EXPLODED VIEW SPARE PART LIST Service Manual YBZ DCI 1 A 1 GB 15 15 APPENDIX...