background image

INSTALLATION

 Remove the wall support mounted the rear of your SXV.

 To install the wall support, locate the template in order to observe the correct distance between mounting holes marked on it. 

 Secure the wall support with 4 screws (not supplied).

NOTE for flooring installation: 

After determining the outlet for the condensate 

evacuation (LH, RH, rear), 

take care to install with a positive slop for 

condensate drainage.

Condensates evacuation

Location of threaded rods (Dia 8mm max ) for ceiling installations.

Mounting holes for wall installation

3

 pIpE SELECTION ANd prE-INSTALLATION

 The main advantage of your SXV products is to give the possibility of locating the coolant tubing on the wall support before installing the unit (using the 

template supplied).

 Place the tube locating template on the wall support. (Fig 7-1, Fig 7-2)

 After choosing your coolant tubing input location(right, left or rear), you can set up your tubing. To do this, use the installation template in order to form 

the tube correctly and thus facilitate connection. 

 Locate the liquid pipe above the gas pipe.

Press

Slide  under 

bracket

Location of

tubing clamps

Pressfully 

home

Recess for

FLARE nuts

All 4 must

support  the 

part

Φ Liquid Pipe

Φ Gas Pipe

SXV 007

1/4"

1/2"

SXV 009

1/4"

1/2"

SXV 012

1/4"

1/2"

SXV 015

1/4"

1/2"

SXV 018

1/4"

1/2"

SXV 021

3/8"

5/8"

SXV 024

3/8"

5/8"

Fig 4

Fig 5

Fig 6

o

o

Fig 7-1

Fig 7-2

Fig 7-3

Fig 8

Reviews: