Installation Procedure

15

Detach the service port's cap of gas stop valve, the valve rod's cap for liquid

stop valve and gas stop valve, and connect the service port into the projection

of charge hose (low) for gaugemanifold. Then connect the projection of

charge hose (center) for gaugemanifold into vacuum pump.

Open the handle at low in gaugemanifold, and operate vacuum pump. If the

scale-moves of gause (low) reach vacuum condition in a moment, check

the step 1 again.

Vacuumize for over 15min. And check the level gauge which should read -

0.1MPa (-76 cm Hg) at low pressure side. After the completion of vacuumizing,

close the handle 'Lo' in the vacuum pump. Check the condition of the scale

and hold it for 1-2min. If the scale-moves back in spite of tightening, make

flaring work again, then return to the beginning of the step 3.

Open the valve rod for the liquid stop valve to an angle of anticlockwise 90

degree. After 6 seconds, close the liquid stop valve and make the inspection

of gas leakge.

No gas leakage? In case of gas leakage, tighten parts of pipe connection. If leakage stops, then proceed the step 6. If it

does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize,

fill up prescribed refrigerant from the gas cylinder.

Detach the charge hose from the service port, open liquid stop valve and

gas stop valve. Turn the valve rod anticlockwise until hitting lightly.

To prevent the gas leakage, turn the service ports cap, the valve rodis cap

for liquid stop valve and gas stop valve a little more than the point where

the torque increases suddenly.

If the refrigerant of the air conditioner leaks, it is necessary to make all the refrigerant out. Vacuumize first, then charge

the liquid refrigerant into air conditioner according to the amount marked on the nameplate.

Vacuuming

Piping vavuum method: to use vacuum pump

1.

2.

3.

4.

5.

6.

7.

CAUTION:

90

Service port

90 for 6 sec.

Open

Liquid stop valve

Gas stop valve

Gauge manifold(R410A)

Vacuum pump(R410A)

Close

Valve rod cap
Valve rod cap

Service port cap

Liquid stop valve

Gas stop valve

Liquid stop valve

Gas stop valve

Summary of Contents for AWAU-YUDA060-H13

Page 1: ...OUTDOOR UNIT INSTALLATION MANUAL EN Please read this manual carefully before using this air conditioner Please keep this manual safely for future use R410A AWAU YUDA060 H13...

Page 2: ......

Page 3: ......

Page 4: ...be checked for any damages If the damaged base is not repaired the unit may fall down and cause accidents When need maintenance and repairment call dealer to handle it Incorrect maintenance and repai...

Page 5: ...to run an abnormal cycle and abnormal cycle and cause the unit to burst In the event of a refrigerant gas leak provide adequate ventilation to the room If leaked refrigerant gas is exposed to a heat...

Page 6: ...at flares and flange connections Use liquid refrigerant to charge the system Charge the unit with gas refrigerant will cause the refrigerant in the cylinder to change its composition and will lead to...

Page 7: ...ling draining pipes follow the instructions in the manual and make sure that they properly drain water so as to avoid dew condensation If not installed properly they may cause water leaks and damage t...

Page 8: ...Refrigerant charging Vacuum Gauze Checking vacuum degree Tools Materials Use Notes Charging Cylinder Refrigerant Charging Must not be used with R410 type units CAUTION Items to Be Checked 1 Verify the...

Page 9: ...ess If a clutch type flare tool is used to machine flares on units that use R410A make the protruding part of the pipe between 1 0 and 1 5mm Copper pipe gauge for adjusting the length of pipe protrusi...

Page 10: ...il from flowing back into the refrigerant circuit when the vacuum pump power is turned off power failure It is also possible to attach a check valve to the actual vacuum pump afterwards Standard degre...

Page 11: ...10 Name of Parts Air inlet Air outlet Compressor Inside of unit YUDA060 YUDA060 will be used as brief model name in this manual AWAU H13...

Page 12: ...acles do not exist near the air inlet and air outlet Place where the air outlet may not be exposed to a strong wind Place surrounded at four sides are not suitable for installation A 1m or more of ove...

Page 13: ...Installation Procedure 3 Installation dimension Unit mm 12 Installation of Outdoor Unit YUDA060 580 25 1250 948 380 340...

Page 14: ...l not to let foreign matters such as sands enter the pipe 4 Piping connection method Forced fastening without centering may damage the threads and cause a gas leakage Model One way piping length Verti...

Page 15: ...M g additional refrigerant per meter That is Refrigerant charging amount L 5m x 45 g m Air Tightness Test When pressurizing for 24 hours a variation of 1 C in the ambient temperature will cause a var...

Page 16: ...the inspection of gas leakge No gas leakage In case of gas leakage tighten parts of pipe connection If leakage stops then proceed the step 6 If it does not stop gas leakage discharge whole refrigerant...

Page 17: ...broken please change it with the type of T3 15A 250VAC But for YUDA060 the type is T6 3A 250VAC The wiring method should be in line with the local wiring standard The power cable and connecting cable...

Page 18: ...RIC POWER IS SUPPLIED BE SURE TO EXECUTE OFF OPERATION BEFORE ELECTRIC POWER IS DISCONNECTED FOR SERVICING This unit has a function of automatic restart system after recovering power stoppage 1 Before...

Page 19: ...Troubleshooting 18...

Page 20: ......

Reviews: