CONTROL SYSTEM
Service Manual
– YBZE DCI 1-A.1 GB
12-13
12.9.1
Installation Test
Installation test is to check any mistake in communication wiring or EEV wiring connections.
Start Installation Test:
RC setting: SPT=30, Cool Mode and press the button “-, +,-, +,-, +” continuously in 3 sec.
Unit operation during Installation test:
Unit will operate in cool mode (IFAN will stop), IDU will display “dd”. Total operating time depends
on IDU numbers, for each IDU maximum operating time is 3min.
Finish the Installation test:
IDU will cancel displaying “dd”, and will display “dn” if any mistake of communication wiring or EEV
wiring is detected from ODU.
12.10
Forced Deicing
Start Forced Deicing
Under Heat Mode, RC setting with SPT=16,
and press the button “+,-,+,-,+,-” continuously in 5 sec.
The Forced Deicing request will be sent to ODU.
After ODU received the Forced Deicing request, IDU will cancel the setting and request of Forced
Deicing
System operation will follow 12.7.6.2 and 12.7.6.3 during Forced Deicing.
12.11
Forced Mode (Compulsory operating function)
.
Entering into forced mode :
After the unit is powered for 5mins, press the light button on remote controller for 3 times in 3s
successively to enter into Freon recovery mode. “Fo” will be displayed. When Freon recovery mode
operated for 25mins, all loads will operate in cooling mode. (The setting fan speed is high fan speed
and the setting temperature is 16C )
Exiting forced mode:
Any signal from remote controller or button will exit the forced mode, and then the unit will operate
at the current setting command.
Forced mode will also be exited after operating for 25mins and then the unit will operate
with the
last operating mode.
Summary of Contents for AWAU-YBZE218-H11
Page 4: ......
Page 14: ......
Page 16: ......
Page 19: ...PERFORMANCE DATA Service Manual YBZE DCI 1 A 1 GB 5 1 5 PERFORMANCE DATA...
Page 20: ......
Page 21: ...PRESSURE CURVES Service Manual YBZE DCI 1 A 1 GB 6 1 6 PRESSURE CURVES...
Page 22: ......
Page 24: ......
Page 26: ......
Page 31: ...WIRING DIAGRAM Service Manual YBZE DCI 1 A 1 GB 9 5 9 6 Wiring connection between IDU and ODU...
Page 32: ......
Page 33: ...WIRING DIAGRAM Service Manual YBZE DCI 1 A 1 GB 10 1 10 REFRIGERATION DIAGRAMS...
Page 34: ......
Page 35: ...TUBING CONNECTIONS Service Manual YBZE DCI 1 A 1 GB 11 1 11 TUBING CONNECTIONS...
Page 36: ......
Page 50: ......
Page 68: ...EXPLODED VIEW SPARE PART LIST 15 12 Service Manual YBZE DCI 1 A 1 GB APPENDIX...