INSTALLATION DETAILS
Version - 1 25 HKD DCI
2.Air purging with vacuum pump
1) Completely tighten the flare nuts of the indoor
and outdoor units, confirm that both the
2-way
and 3-way valves are set to the closed position.
2) Connect the charge hose with the push pin of
handle lo to the 3-way valves gas service port.
3) Connect the charge hose of handle hi
connection to the vacuum pump.
4) Fully open the handle Lo of the manifold valve.
5) Operate the vacuum pump to evacuate.
6) Make evacuation for 30 minutes and check
whether the compound meter indicates -
0.1Mpa. If the meter does not indicate
-0.1Mpa after pumping 30 minutes, it should be
pumped 20 minutes more. If the pressure can’t
achieve -0.1Mpa after pumping 50 minutes,
please check if there are some leakage points.
Fully close the handle Lo valve of the manifold
valve and stop the operation of the vacuum pump.
Confirm that the gauge needle does not move
(approximately 5 minutes after turning off the
vacuum pump).
7) Turn the flare nut of the 3-way valves about
45° counterclockwise for 6 or 7seconds after the
gas coming out, then tighten the flare nut again.
Make sure the pressure display in the pressure
indicator is a little higher than the atmosphere
pressure. Then remove the charge hose from the
3 way valve.
8) Fully open the 2 way valve and 3 way valve
and securely tighten the cap of the 3 way valve.
7.7 Re-installation while the outdoor
unit need to be repaired
1. Evacuation for
the whole system
Procedure:
1).
Confirm that both the 2-way and 3-way valves
are set to the opened position.
2). Connect the vacuum pump to 3-way valve
’s
service port.
3). Evacuation for approximately one hour.
Confirm that the compound meter indicates -
0.1Mpa.
4). Close the valve (Low side) on the charge set,
turn off the vacuum pump, and confirm that the
gauge needle does not move (approximately 5
minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum
pump.
2. Refrigerant charging
Procedure:
1). Connect the charge hose to the charging
cylinder, open the 2-way valve and the 3-way
valve
Connect the charge hose which you disconnected
Summary of Contents for 7SP023054
Page 12: ...DIMENSION Version 1 12 HKD DCI For AWSI HKD009 N11 For AWSI HKD012 N11 For AWSI HKD018 N11...
Page 13: ...DIMENSION HKD DCI 13 Version 1 For AWSI HKD024 N11...
Page 59: ...EXPLODED VIEW AND SPARE PART LIST HKD DCI 59 Version 1...
Page 65: ...EXPLODED VIEW AND SPARE PART LIST HKD DCI 65 Version 1...
Page 69: ...HKD DCI 69 Version 1 SERVICE MANUAL HKD DCI Series...