INSTALLATION DETAILS
HKD DCI 24 Version - 1
scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set
and charge the system with liquid refrigerant.
6).When the electronic scale displays the proper
weight (refer to the table), disconnect the charge
hose from the 3-
way valve’s service port
immediately and turn off the air conditioner before
disconnecting the hose.
7). Mount the valve stem caps and the service port
Use torque wrench to tighten the service port cap
to a torque of 18N.m.
Be sure to check for gas leakage.
7.5 Adding the refrigerant after running
the system for many years
Procedure:
1). Connect the charge hose to the 3-way service
port, open the 2-way valve and the 3-way valve.
Connect the charge hose to the valve at the
bottom of the cylinder. If the refrigerant is R410A,
make the cylinder bottom up to ensure liquid
charge.
2). Purge the air from the charge hose.
Open the valve at the bottom of the cylinder and
press the check valve on the charge set to purge
the air (be careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic
scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set
and charge the system with liquid refrigerant.
6).When the electronic scale displays the proper
weight (refer to the gauge and the pressure of the
low side), disconnect the charge hose from the 3-
way valve’s service port immediately and turn off
the air conditioner before disconnecting the hose.
7). Mount the valve stem caps and the service port
Use torque wrench to tighten the service port cap
to a torque of 18N.m.
Be sure to check for gas leakage.
7.6 Re-installation while the indoor unit
need to be repaired
1. Collecting the refrigerant into the outdoor
unit
Procedure
1). Confirm that both the 2-way and 3-way valves
are set to the opened position
Remove the valve stem caps and confirm that the
valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the
valve stems.
2). Connect the charge hose with the push pin of
handle lo to the 3-way valves gas service port.
3). Air purging of the charge hose.
Open the handle Lo valve of the manifold valve
slightly to purge air from the charge hose for 5
seconds and then close it quickly.
4). Set the 2-way valve to the close position.
5). Operate the air conditioner at the cooling cycle
and stop it when the gauge indicates 0.1MPa.
6). Set the 3-way valve to the closed position
immediately
Do this quickly so that the gauge ends up
indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way
and 3-
way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves
service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
Summary of Contents for 7SP023054
Page 12: ...DIMENSION Version 1 12 HKD DCI For AWSI HKD009 N11 For AWSI HKD012 N11 For AWSI HKD018 N11...
Page 13: ...DIMENSION HKD DCI 13 Version 1 For AWSI HKD024 N11...
Page 59: ...EXPLODED VIEW AND SPARE PART LIST HKD DCI 59 Version 1...
Page 65: ...EXPLODED VIEW AND SPARE PART LIST HKD DCI 65 Version 1...
Page 69: ...HKD DCI 69 Version 1 SERVICE MANUAL HKD DCI Series...