
iRelay 460 Equipment Installation Guide
UGD-D01035
Airspan Commercial and Internal Use
33
D RFI Checklist
Before installation, review all details in the following checklist. It lists the details of parameters and
items that need to be gathered before the equipment installation.
No
Site Readiness Details
Comments
1
Site Details
1.1
Site name
1.2
Site ID
1.3
Site address
1.4
Site GPS coordinate
(DD MM SS)
Latitude
Longitude
1.5
Site type
☐
Tower
☐
Pole
☐
Building
☐
Other
Other
:
1.6
Access details to the site
1.7
Contact details of site engineer
1.8
Permission for installation
1.9
IP plan available
1.10
Transmission plan available
1.11
Link budget available
2
Electrical
2.1
Type of power supply
☐
AC
☐
DC
☐
No power
2.2
Location of the power point
2.3
Isolation switch installed
☐
Yes
☐
No
2.4
MCB installed with power connectivity
☐
Yes
☐
No
2.5
Location for PoE
2.6
PoE to power source distance
2.7
PoE to iR460 distance
3
Earthing/Grounding
3.1
Earth connectivity is available
☐
Yes
☐
No
3.2
Earth of tower/pole verified
☐
Yes
☐
No
3.3
Cable trays are earthed (if applicable)
☐
Yes
☐
No
4
Tower/Pole
4.1
Tower/pole height as per survey report