4. Operation
4
-
8
A070368-1
SG0114-1
Install a switch between the output terminal and
the load to switch
“
ON/OFF
”
the load. Do not
switch the load on/off directly by the
circuit-breaker of the machine.
It could cause damage to the Connect the
connecting cable to the load so that the output
terminals should not touch each other.
circuit-breaker.
4.4.1 How to connect three phase load
In case of three-phase load:
Each electric current value of each phase (U
・
V
・
W) should not
exceed the values in the following table. But please note that
the data in the table is based on power factor of 80% (in case
of electric motor operated). In case of different power factor,
take care not to be overloaded, and reduce load.
Type
Permissible current value
50Hz/200V 107A
60Hz/220V 118A
50Hz/380V 56.2A
50Hz/400V 53.4A
60Hz/440V 59.0A
In case inverter load:
The inverter capacity (input kVA of inverter) should not exceed the following value (within rated
output
÷
3.0). Also select generator so that the rated output (kVA) of generator so that the rated
output (kVA) of generator may be three times of the inverter capacity.
Example: In case of SDG45S,at 50Hz, 37kVA
÷
3.0 = 12.3kVA.
50Hz: 12.3kVA (Input kVA of inverter) It is possible to use inverter capacity up to this value.
60Hz: 15.0kVA (Input kVA of inverter) It is possible to use inverter capacity up to this value.
Switch panel for
switching on/off load
Load
Summary of Contents for SDG45S-3A8
Page 1: ......
Page 3: ......
Page 11: ......
Page 15: ......
Page 19: ......
Page 32: ......
Page 34: ......
Page 35: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ...10 Piping Diagram 10 1 10 1 Fuel piping A080458E...
Page 62: ......