11
Ensure the correct assignment of supply air and extract air, as this can no longer be changed!
2.
Finished and correct concreting of the connection plate including Airflex Pro
2.5.4 Connecting the MultiPlexBox with the connection plate.
Once the concrete has set, remove the formwork and check that all pipe connections and insert nuts are
clean, rework accordingly, if necessary.
The connection set 90001247, which is available as an accessory, is required for the connection of the
MultiPlexBox and connection plate 90001252.
Contents of connection set:
12 pcs plastic fitting
B.
2 pcs wide mounting bracket
A.
2 pcs narrow mounting bracket, incl. screws.
Please follow the step-by-step guidance on page 12:
A. Plastic blanking caps
B. Mounting bracket
with screws
C. Wide mounting
bracket with screws
WARNING: Risk of accidents and injuries during installation and servicing!
At least two people and/or one suitable lifting device are required to install the
MultiPlexBox.