4.3 – MOUNTING
Probes.
See separate Installation Instructions for the installation/mounting of ELECTRA-flo Probes and Stations.
Transmitter.
This section may be skipped if the unit is an ELECTRA-flo/CM or ELECTRA-flo/M, as the Transmitter
may have been ordered Factory mounted to the Station.
– Tools Required: Electric drill; #25 (0.1495") bit; screwdriver or nutdriver; and four #8-32 self-tapping machine screws.
– The ELECTRA-flo can be mounted in any position provided it is secured using all four mounting holes.
– Reasonable consideration should be given to clearances for electrical connections.
– Once a suitable location is found, use the unit as a template to mark the centers of the four mounting holes.
– Drill four pilot holes at the marked locations. With the unit in position, install the four #8-32 screws.
Figure 4.1
4.4 – PROCESS CONNECTIONS
See separate Installation Instructions provided with the ELECTRA-flo Probes for information on connecting cables
from the Probes or Station to the Transmitter.
ELECTRA-flo/CM and ELECTRA-flo/M has cables already installed.