Air Burners, Inc.
BurnBoss Series Air Curtain Burner (Kubota Z482
-
E3 Engine)
OPERATING MANUAL
(Vers. 08.08.2017)
Page 26 of 27
THERMO CERAMIC PATCHING COMPOUND
For minor repair of Air Burners refractory panels and doors.
Part # 6900
-
1003
Thermo Ceramic Wet Pre
-
Mix
NOTE: This is an air cured product, reseal unused portion immediately.
Once opened the shelf life is one (1) year.
Directions:
1)
Cracking of the panels is normal as they flex in the heat. Filling the cracks
every 6 months or as needed will extend the life of your Thermo Ceramic
Panels.
2)
Air Burners patching compound is pre
-
mixed and ready to use (may require
some stirring).
3)
Storage: Compound should be stored indoors in a frost free location.
4)
Preparation: The area in and around the damaged area to be patched must
be cleaned and brushed to provide the best surface for the compound to ad-
here. Remove all loose refractory and debris from the area to be patched.
5)
Wet the cleaned surface with a light spray or damp cloth.
6)
Installation: Using a trowel or similar tool, pack the refractory compound ma-
terial into cracks and into areas where the refractory is missing. To achieve
proper thickness trim off the excess material using a sharp flat blade or the
side of the trowel.
7)
Allow the material to harden overnight before placing the FireBox back into
service. After the compound has hardened operate the FireBox under nor-
mal conditions.
AIR BURNERS INC.
4390 Cargo Way, Palm City, FL 34990
772
-
220
-
7303
E
-
mail: [email protected]