6
Installation
MAINS OPERATING VOLTAGE
The operating voltage of the instrument is shown on the rear panel. Should it be necessary to
change the operating voltage from 230V to 115V or vice-versa, proceed as follows:
1.
Disconnect the instrument from all voltage sources.
2.
Remove the 4 screws which hold the upper and lower case halves together and lift off the
case upper.
3.
Remove the 4 screws which hold the power supply printed circuit board to the case lower.
4.
Change the appropriate zero-ohm links in the pcb:
Link LK1 only for 230V operation
Link LK2 and LK3 only for 115V operation
5.
Refit the pcb to the case lower, ensuring all connections (especially safety earth) are
remade as before, and refit the case upper.
6.
To comply with safety standard requirements the operating voltage marked on the rear
panel must be changed to clearly show the new voltage setting.
MAINS LEAD
When a three core mains lead with bare ends is provided it should be connected as follows:
Brown
-
Mains live
Blue
-
Mains Neutral
Green/Yellow
-
Earth
WARNING! THIS INSTRUMENT MUST BE EARTHED
Any interruption of the mains earth conductor inside or outside the instrument will make the
instrument dangerous. Intentional interruption is prohibited.
Summary of Contents for TGP110
Page 1: ...MODEL TGP110 10MHz Pulse Generator INSTRUCTION MANUAL...
Page 9: ...8...