Page 27 of 83
SK2018 PCG(H)-V/P-AECM-001
B.7.
Condensate Drainage Connection
The unit is fitted with a condensate pump with a maximum of 19-11/16” lift.
Confirm drain outlet has not been damaged before connecting drain pipe to unit.
Discharge pipe may be connected with hose clamp. (Figure B.7.1)
The drain must be installed with a downward slope.
Insulate drain pipe after installation.
Figure B.7.1
(All dimensions are approximate within 1/16 of an inch of those indicated.)
B.8.
External Drain Pan Installation
1.
Align the two screw holes in the fixing plate to the two holes in the external drain pan. (Figure B.8.1 and B.8.2)
2.
Make sure the drain pan is horizontal.
3.
Tighten the two screws while making sure the external drain pan is installed flush against the fixing plate. (Figure B.8.3)
4.
When the installation is completed, it is necessary to wrap the connecting pipe with thermal insulation to prevent
condensation on ceiling tiles.
Figue B.8.1
Figure B.8.2
Figure B.8.3
Caution
Factory-provided drain outlet is ABS. Using an unsuitable glue may damage the drainage outlet.
External Drain Pan
Internal Drain Pan