Agriframes, Journal house, Hartcliffe Way, Bristol, BS3 5RJ
Orderline: 0117 934 1790 Fax: 0117 934 17 91
Order on-line: www.agriframes.co.uk
Place the structure at the intended installation location…
14.
Place the Top section of the Gazebo in the desired location, you
wish for the Gazebo to be installed, ensure that the ground is
reasonably level.
15.
Push the structure into the ground to mark or indent the soil for
the uprights.
16.
Remove the structure, then using the Hole Maker make holes at
the marked locations, the holes should be 15” deep. Use a spirit
level to check that the holes are vertical and to the same depth.
17.
Tap an end plug into the non-reduced end of 8 of the upright tubes,
then insert these tubes (end plug facing down) into the hole, and
slide a moisture seal over the reduced end of the upright.
18.
Connect the remaining 8 uprights to the uprights in the ground and
cover the join of the 2 poles with a moisture seal.
19.
Slide over a Spacer Bar with Ring Clamps, position the bar 6” above
the ground.
20.
Slide on another Spacer Bar and position the second Spacer Bar 40”
above the bottom Spacer Bar and tighten the grub screw.
21.
Slide a moisture seal over the reduced end on the uprights.
Lift the Top of the Gazebo onto the uprights…
22.
Lift the constructed Gazebo Top onto the uprights, ensure that the
Gazebo Top is lowered evenly onto the uprights.
23.
Cover the Joins with moisture seals.
24.
Position the top Spacer Bar, previously attached to the Gothic
Curves, 19” from the middle Spacer Bar.
Final checks…
25.
Check that all of the joins have been covered by moisture seals.
26.
Ensure that all of the connectors have been tightened and are fully
secured.
Optional Component: Fixing the Bottom Lattice Section…
27.
Take the 4 x 3 lattice panels and the Lattice Ties.
Figure 2: Position of the 2-Way connectors on the Gothic Curves
12
15
13
14
20
21
22
23
24
25
16. Slide over a spacer bar with ring clamps, position the bar 6"
above the ground.
17. Connect the remaining 8 uprights to the uprights in the
ground and cover the join of the 2 poles with a moisture seal.
18. Slide on another Spacer bar and position the second spacer bar
40" above the bottom spacer bar and tighten the grub screw.
19. Slide a moisture seal over the reduced end on the uprights.