![background image](http://html.mh-extra.com/html/agora-models/steve-mcqueens-iconic-porsche-917kh-pack-02/steve-mcqueens-iconic-porsche-917kh-pack-02_build-instructions_2869150015.webp)
Press the pins of the
cylinder tops (8F) into
the corresponding
holes in the
cylinder
bottoms (8G) to create
eight cylinders.
Push the
oil filter
cover (8E) into the oil
filter bracket (8D).
Take the two
oil hoses
(8C) and connect
them to the lugs on
the
oil pump (8B),
then press the oil
pump into the
water
pump housing (8A).
Tip: if the hoses are
bent, try dipping
them in hot water and
bending them back to
into shape.
S T E P 1
S T E P 2
You may wish to super
glue the cylinder parts
to avoid them splitting
at a later stage.
15
15
AGORA
MODELS
STAGE 08: PREPARING THE OIL PUMP,
WATER PUMP AND CYLINDERS
Summary of Contents for STEVE MCQUEEN'S ICONIC PORSCHE 917KH Pack 02
Page 13: ...STAGE COMPLETE 13 13 AGORAMODELS PORSCHE 917KH STAGE07 RIGHT SIDEOFENGINEBLOCK ...
Page 22: ...STAGE COMPLETE STAGE 09 ATTACHING THE RIGHT CYLINDER HEAD 22 22 AGORAMODELS PORSCHE 917KH ...
Page 26: ...STAGE COMPLETE STAGE 10 ASSEMBLE AND FIT THE CRANKCASE TOP 26 26 AGORAMODELS PORSCHE 917KH ...
Page 34: ...STAGE 12 BUILDING THE FUEL PUMP STAGE COMPLETE 34 34 AGORAMODELS PORSCHE 917KH ...