Overview
2
Steps
1.
Preparing the GC
2.
Installing the flow manifold
3.
Installing the makeup gas regulator (nonEPC detectors only)
4.
Positioning and securing the detector
5.
Connecting the detector
6.
Routing the tubing
7.
Installing the nutwarmer cup (adaptable NPD only)
8.
Restoring the GC to operating condition
9.
Calibrating your detector (EPC detectors only)
Summary of Contents for NPD
Page 27: ......