Service Guide N5242-90001
7-55
PNA Series Microwave Network Analyzers
Repair and Replacement Procedures
N5242A
Removing and Replacing the A54 Option 029 Test Port 2 Bridge and the A55 Option 029 Noise Downconverter
Replacement Procedure
1. Reverse the order of the removal procedure.
• When reassembling the A54/A55 assembly, lay the assemblies on a flat surface while
installing and tightening the interconnecting cable (adapter) to ensure that these
assemblies will be flush with the side frame when installed.
• Torque all cable connections to 10 in-lbs.
2. Perform the post-repair adjustments, verifications, and performance tests that pertain
to this removal procedure. Refer to
.
Figure 7-25
A54 Option 029 Test Port Bridge and A55 Noise Downconverter Removal
Summary of Contents for N5242A
Page 11: ...Service Guide N5242 90001 1 1 1 Safety and Regulatory Information...
Page 19: ...Service Guide N5242 90001 2 1 2 General Product Information...
Page 33: ...Service Guide N5242 90001 3 1 3 Tests and Adjustments...
Page 75: ...Service Guide N5242 90001 4 1 4 Troubleshooting...
Page 119: ...Service Guide N5242 90001 5 1 5 Theory of Operation...
Page 153: ...Service Guide N5242 90001 6 1 6 Replaceable Parts...
Page 237: ...Service Guide N5242 90001 7 1 7 Repair and Replacement Procedures...
Page 303: ...Service Guide N5242 90001 8 1 8 General Purpose Maintenance Procedures...