Agilent Technologies N4419B Installation And User Manual Download Page 12

1-6

 

Installing the Test Set

Step 2. Set Up the PNA

Step 2. Set Up the PNA

1.

Using the PNA Installation and Quick Start Guide, set up the network analyzer. 

2.

If you are installing your PNA in an equipment rack, be sure to leave at least 2 rack 
units of space 

below

 the analyzer to install the test set.

NOTE

For the N4420B or N4421A/B test set, connect the PNA to the test set 
before placing in the rack as a single unit on one set of rails. Refer to

“Step 

3. Attach the PNA to the Test Set” on page 1-7

 for instructions.

Summary of Contents for N4419B

Page 1: ...Option 550 Note If this Test Set is to be used with PLTS software please DO NOT USE THIS MANUAL Use the PLTS Installation Guide N1930 90005 that was shipped with PLTS and is also available at www Agil...

Page 2: ...NT THAT CONFLICT WITH THESE TERMS THE WARRANTY TERMS IN THE SEPARATE AGREEMENT WILL CONTROL DFARS Restricted Rights Notice If software is for use in the performance of a U S Government prime contract...

Page 3: ...ion pertaining to this product is located in Chapter 3 Safety and Regulatory Information Safety Notes The following safety notes are used throughout this manual Familiarize yourself with each of the n...

Page 4: ...pabilities and limitations of Option 550 Click Help on the PNA menu bar or press the Help key on the PNA front panel This Installation Guide helps you to connect the Test Set to the PNA The N4419B N44...

Page 5: ...a Bench Top or in an Equipment Rack 1 10 Step 5 Make the Interconnections between the Test Set and the PNA 1 16 Step 6 Set Up the General Purpose Interface Bus GPIB 1 22 Step 7 Power up the System 1 2...

Page 6: ...Contents vi Service Guide N5242 90001 Contents...

Page 7: ...1 1 1 Installing the Test Set...

Page 8: ...Up the PNA 3 Attach the Test Set to the Network Analyzer N4420B or N4421B Test Set Only 4 Install the Test Set on a Bench Top or in an Equipment Rack 5 Make the Interconnections between the Test Set...

Page 9: ...system from the containers in which it was shipped WARNING The test set hardware may be heavy Use proper lifting techniques 2 Carefully inspect the test set hardware to make sure that it was not damag...

Page 10: ...3 Varies by Test Set Model and Option Semirigid interconnect cables refer to Step 5 Make the Interconnections between the Test Set and the PNA 4 Unique to country AC Power Cord for the test set 5 AD0...

Page 11: ...t 4 If you ordered any of the following options check the parts Option 1CP is shipped in a separate container Option Number Item Number Part Description 1CP 1A 1B Rack mount flange kit For use with ha...

Page 12: ...f you are installing your PNA in an equipment rack be sure to leave at least 2 rack units of space below the analyzer to install the test set NOTE For the N4420B or N4421A B test set connect the PNA t...

Page 13: ...ttached to the N4420B and N4421B test sets using lock links at the front and locking feet at the rear Preparing the PNA 1 Remove the four feet from the bottom of the PNA 2 Remove the screws from the t...

Page 14: ...0515 1619 from the rear panel on the test set 5 Install the top left and right rear locking feet from the kit 5063 9253 using screws 0515 1244 6 Remove the trim strip from the top of the front frame 7...

Page 15: ...g the PNA to the Test Set 8 Place the PNA on top of the test set ensuring that the front frame of the PNA is positioned slightly forward of the lock links that are attached to the the test set Then sl...

Page 16: ...t 9 Secure the PNA lower locking feet to the test set s upper locking feet using the spring loaded screws NOTE If the screw holes are not aligned loosen the screws that secure the feet to both the PNA...

Page 17: ...ntilation Requirements When installing the product in a cabinet the convection into and out of the product must not be restricted The ambient temperature outside the cabinet must be less than the maxi...

Page 18: ...he bench top Make sure that there is at least four inches of clearance on the sides and back of the system for adequate ventilation The front panel test cables are shown only as a reminder to make sur...

Page 19: ...placing in the rack as a single unit on one set of rails 3 Attach the cabinet mount flanges and the handles to the sides of the front panel Removing Feet from PNA Leaving Feet attached to PNA 1 Instal...

Page 20: ...Rack using two long screws per side Attach the flanges to the outside of the handles WARNING If an instrument handle is damaged you should replace it immediately Damaged handles can break while you ar...

Page 21: ...sing the directions imprinted on the feet 5 Ensure there is adequate clearance between the system cabinet and the sides and back of the test system for adequate ventilation CAUTION Consider the ventil...

Page 22: ...set and slide it onto the rails that you installed earlier from the front of the equipment rack Secure the test set to the equipment rack using the screws with washers and metal clipped nuts provided...

Page 23: ...rs to 8 inch pounds NOTE The Reference channel path through the test set is used to compensate for electrically long DUTs This also results in added loss in the Reference channel and higher trace nois...

Page 24: ...connection of the cable TIP If the test set and the PNA are rack mounted the screws securing the rack mount flanges to the instrument rack may be loosened slightly to allow for minor repositioning of...

Page 25: ...ween the Test Set and the PNA N4420B Test Set with E8363B and N4421B Test Set with E8364B CAUTION Damage to the interconnect cable can result from improper orientation of the cable Refer to page 1 16...

Page 26: ...PNA Help system Call Out Sequence Cable Part Number From Network Analyzer To Test Set 1 Z5623 20215 REF 1 SOURCE OUT REF 1 R1 OUT 2 Z5623 20215 REF 1 RCVR R1 IN REF 1 RCVR R1 IN 3 Z5623 20215 REF 2 R...

Page 27: ...ns between the Test Set and the PNA N4419B Test Set with E8362B or N5230A Option 225 CAUTION Damage to the interconnect cable can result from improper orientation of the cable Refer to page 1 16 for d...

Page 28: ...NOTE Cables are orderable only as cable set AD00756 Call Out Sequence Cable Part Number From Network Analyzer To Test Set 1 AD00756 1 REF 1 SOURCE OUT REF 1 SOURCE OUT 2 AD00756 1 REF 1 RCVR R1 IN RE...

Page 29: ...numbered 0 to 30 However there may be the occasion that you need to change the GPIB address for test equipment GPIB addresses are set either using rear panel switches or using the equipment firmware R...

Page 30: ...ent NOTE Perform Step 6 ONLY when both of the following are true Otherwise skip to Step 7 Using the Reference channel paths through the test set See page 1 16 for more information Using a PNA model E8...

Page 31: ...When the PNA application has completely powered up and the default trace is present then a Click System point to Configure then click Multiport Capability b On the Multiport Restart dialog select Tes...

Page 32: ...PNA 2 Set the stop frequency on the PNA channel to the maximum frequency of either the test set or the PNA which ever is lower This is probably the default setting 3 On the PNA click Trace then Delete...

Page 33: ...2 1 2 Specifications and Characteristics...

Page 34: ...erformance Specifications include guard bands to account for the expected statistical performance distribution measurement uncertainties and changes in performance due to environmental conditions Char...

Page 35: ...tions and physical characteristics are displayed on the following pages Frequency Range Table 2 1Test Set Frequency Range and PNA Model Test Set Model Frequency Range Recommended PNA Model N4419B 10 M...

Page 36: ...est sets are listed below Weight and Dimensions Table 2 2Test Set Weight and Dimensions Model Number Weight Dimensions Height A Width B Depth C N4419B 9 0 kilograms 19 9 pounds 3 0 in 7 62 cm 16 75 in...

Page 37: ...3 1 3 Safety and Regulatory Information...

Page 38: ...al layer test system CAUTION Caution denotes a hazard It calls attention to a procedure that if not correctly performed or adhered to would result in damage to or destruction of the instrument Do not...

Page 39: ...his symbol indicates that the power line switch is in the OFF position This symbol is used to identify a terminal which is internally connected to the product frame or chassis The CE mark is a registe...

Page 40: ...struction documentation contains information and warnings which must be followed by the user to ensure safe operation and to maintain the instrument in a safe condition Safety Earth Ground WARNING Thi...

Page 41: ...pply voltage is in the specified range Servicing WARNING No operator serviceable parts inside Refer servicing to qualified personnel To prevent electrical shock do not remove covers WARNING These serv...

Page 42: ...could be impaired This product must be used in a normal condition in which all means for protection are intact only CAUTION This product is designed for use in Installation Category II and Pollution...

Page 43: ...ents This ISM device complies with Canadian ICES 001 Cet appareil ISM est conforme a la norme NMB du Canada Compliance with German Noise Requirements This is to declare that this instrument is in conf...

Page 44: ...3 8 Safety and Regulatory Information Regulatory Information...

Reviews: