
1-20
Installing the Test Set
Step 5. Make the Interconnections between the Test Set and the PNA
NOTE
* The Reference channel path through the test set is used to compensate for
electrically long DUTs. This also results in added loss in the Reference
channel and higher trace noise.
Therefore, unless making high speed measurements of electrically long
devices, do NOT remove the PNA
REFERENCE 1
and
REFERENCE 2
front-panel loops, and do NOT use the Reference channel interconnect
cables (items 1, 2, 3, 4, 13, and 14).
For more information, see ‘Electrically long devices’ in the PNA Help
system.
Call Out
Sequence
Cable Part
Number
From
Network Analyzer
To
Test Set
1*
Z5623-20215
REF 1 SOURCE OUT
REF 1 R1 OUT
2*
Z5623-20215
REF 1 RCVR R1 IN
REF 1 RCVR R1 IN
3*
Z5623-20215
REF 2 RCVR R2 IN
REF 2 RCVR R2 IN
4*
Z5623-20215
REF 2 SOURCE OUT
REF 2 R2 OUT
5
Z5623-20216
PORT 1 SOURCE OUT
PORT 1 SOURCE OUT
6
Z5623-20216
PORT 1 CPLR THRU
PORT 1 CPLR THRU
7
Z5623-20216
PORT 2 CPLR THRU
PORT 2 CPLR THRU
8
Z5623-20216
PORT 2 SOURCE OUT
PORT 2 SOURCE OUT
9
Z5623-20217
PORT 1 CPLR ARM
PORT 1 CPLR ARM
10
Z5623-20217
PORT 1 RCVR A IN
PORT 1 RCVR A IN
11
Z5623-20217
PORT 2 RCVR B IN
PORT 2 RCVR B IN
12
Z5623-20217
PORT 2 CPLR ARM
PORT 2 CPLR ARM
13*
E8364-20059
REF 1 on rear panel of the test set
14*
E8364-20059
REF 2 on rear panel of the test set