2
Installation
Installing the IDP-10 Pump
20
Agilent G6697A Oil Free IDP-10 Dry Scroll Pump Installation Guide
5
Connect the power cord supplied with the kit to the IDP-10 pump as shown in
6
Connect the power cord to back panel of the Agilent GC/MS instrument as
shown in
7
Turn on the Agilent GC/MS.
8
Allow the GC/MS to run continuously for approximately 2 hours to remove
any potential excess moisture from the system.
Figure 10.
Power Cord Connection to IDP-10
Figure 11.
Connecting IDP-10 Pump to back of GC/MS
IDP-10 Pump power cable
NOTE
The supply of power to the IDP-10 pump is controlled by the Agilent 7000 and
7010 Series GC/MS Instrument. The pump will power up automatically as part
of the overall MSD start process.