![Agilent Technologies G3440-68011 Installation Instructions Manual Download Page 25](http://html.mh-extra.com/html/agilent-technologies/g3440-68011/g3440-68011_installation-instructions-manual_2868505025.webp)
Agilent G3440-68011 Micro Electron Capture (µECD) 3rd Detector
Installation Instructions
25
13
Connect the source gas line to the bulkhead fitting using the provided
1/8-inch nuts and ferrules.
14
Turn on gas pressures and leak-check all fittings. In general, set the source
gas pressure to 410 kPa (60 psi). Correct any leaks.
15
Reinstall the side cover onto the third detector box assembly.
16
Check the
μ
ECD paperwork to make sure it is safely complete. See
.
Figure 34
µECD paperwork