![Agilent Technologies G3440-68011 Installation Instructions Manual Download Page 18](http://html.mh-extra.com/html/agilent-technologies/g3440-68011/g3440-68011_installation-instructions-manual_2868505018.webp)
18
Installation Instructions
Agilent G3440-68011 Micro Electron Capture (µECD) 3rd Detector
Make the gas connections
1
Place the bulkhead fitting retainer onto the back of the third detector box
assembly frame as shown and install using a 12 mm long M4 screw. See the
figure below.
2
Remove the nut, ferrules, and hex nut from the bulkhead union.
3
Insert the bulkhead union threaded stud through the back of the frame (and
the bulkhead fitting retainer). Use the hex nut and 1/2-inch wrench to
secure in place.
M4 x 12 mm long
screw
Bulkhead retainer
WARNING
The effluent gas stream from the detector must be vented to a fume hood to
prevent possible contamination of the laboratory with radioactive material.
USA Owners: Detector venting must be in conformance with the latest revision
of the Title 10, Code of Federal Regulations, Part 20 (including Appendix B).
Bulkhead retainer
Hex nut
Nut and ferrules