
Instrument Installation Checklist
Revision:
A.00
, Issued:
January
17
, 20
21
Document part number:
D0007550
Page ____ of ____
© Agilent Technologies, Inc. 20
21
Note: The small black wires on the TEC cable can pair with either small blue or small black and
the blue and yellow wires on the TEC cable can pair with either small red.
6
Route the TEC cable around the fan and place the cover over the TEC.
7
Attach the cover with four screws (P/N 0515-0430) and a T-10 driver, two on the top of the
cover and two on the bottom.
8
Route the TEC cable through the deck pass-through.
Installing the condensation pump
1
Using a T-10 driver, partially install two M3 x 40-mm mounting screws into the holes for the
pump located on the underside of the deck (over the solvent tray).
Figure 17 Condensation pump mounting screws partially installed