
Revision: A.00, Issued: January17, 2021
Document part number: D0007550
Page ____ of ____
© Agilent Technologies, Inc. 2021
Agilent G9542A RapidFire 400 System Temperature
Control Unit
Installation Checklist
Thank you for purchasing an Agilent G9542A RapidFire 400 System Temperature Control Unit.
This checklist is used by the installing engineer to ensure that the instrument and associated
systems are correctly installed, upgraded, and functioning as designed in your facility. This
checklist will be completed at the end of the service and provided to you as a record of the
installation.
Introduction
Customer Responsibilities
Customers should leave the instrument shipment for the engineer to unpack.
Customers should provide all necessary operating supplies upon request of the engineer.
A customer representative should be available to the engineer while performing the
installation.
Some installation tasks will be beneficial to you if you are present – refer to sections in this
checklist.
Important Customer Web Links
Videos about specific preparation requirements for your instrument can be found by
searching the
Agilent YouTube
https://www.youtube.com/user/agilent
To access
Agilent University
http://www.agilent.com/crosslab/university/
training options, which include online, classroom and onsite delivery.
A training specialist can work directly with you to help determine your best options.
A useful
Agilent Resource Center
web page is available, which includes short videos on
maintenance, quick lists of consumables for new instruments, and other valuable information.
Check out the Resource Page here:
https://www.agilent.com/en-us/agilentresources
Need technical support, FAQs, supplies? – visit our
Support Home page
at