![Agilent Technologies 5500a Operation Manual Download Page 9](http://html.mh-extra.com/html/agilent-technologies/5500a/5500a_operation-manual_2867916009.webp)
Getting Started
Agilent 5500 Series FTIR Operation Manual
9
2.
Getting Started
Unpacking 9
Connecting power
11
Connecting the computer
14
Turning on the instrument
15
Starting the software
16
Performance verification 17
Unpacking
To unpack your spectrometer system:
1
After receiving the Agilent 5500 Series FTIR delivery, do not
immediately open the shipping container. Instead, place the
shipment in a room-temperature environment and allow several
hours for the contents of the container to reach the room
ambient temperature. This is to avoid unnecessary condensation
on the components prior to the initial setup and installation
process.
2
The shipping enclosure should contain the items listed below.
Inspect the enclosure closely to make sure all items have been
removed from the shipment packaging. Also ensure that all the
items in the packing list below have arrived undamaged and are
in good working condition. Contact Agilent immediately if any
items are found to be missing in shipment or damaged.
NOTE
Keep all original packing material for storing, shipping and transporting the
system in the future.
Summary of Contents for 5500a
Page 1: ...Agilent 5500 Series FTIR Operation Manual ...
Page 53: ......