Chapter 2
41
Agilent 4072/4073 Preinstallation Guide, Edition 4
Site Preparation
Site Preparation Checklist
Did you check the installation area to ensure class 10,000 or better air cleanliness?
If some of the following apply to your site, Agilent Technologies recommend that you check the air
cleanliness using a particle counter.
•
Temperature, humidity, and cleanliness are not controlled.
•
The flooring material is carpet.
•
Outdoor air flows directly into the installation site.
•
You do not change clothes and shoes.
•
Items near the installation site are covered with dust.
Did you provide proper air flow?
Upgrade
Did you prepare the proper power supply?
Did you provide the required floor to upgrade?
Safety precautions
Did you prepare suitable metal fittings to attach the system cabinet?
Did you keep general cleanliness of the work area and system equipment for preventing electrical
fires?
Did you check that volatile liquids, such as insulating varnish, lacquer, and turpentine have not
been placed near the tester? (Those are dangerous when used near powered-up electrical and
electronic equipment.)
Table 2-7
Site preparation checklist
Check
Item
Summary of Contents for 4072A Advanced
Page 5: ...5 Agilent 4072 4073 Preinstallation Guide Edition 4 1 General Information ...
Page 11: ...11 Agilent 4072 4073 Preinstallation Guide Edition 4 2 Site Preparation ...
Page 57: ...57 Agilent 4072 4073 Preinstallation Guide Edition 4 4 Receiving ...
Page 71: ...71 Agilent 4072 4073 Preinstallation Guide Edition 4 A Confirming the System Power Safety ...
Page 83: ......