10
• Remove the supplied hardware from each hanger bracket for use later on.
• Position the three brackets evenly around the grain bin peak ring.
• Tighten the u-bolts enough to hold the brackets in place, but loose enough to adjust the
positioning around the peak ring.
• Using the existing hole in each bracket for a “template”, drill a permanent mount hole through
the peak ring at each location.
• Secure each bracket with the supplied hardware
SPACE EVENLY 3 PLC’S
Peak Ring Positioning
PEAK RING
Hanger Position (Side View)
Hanger Position (Front View)
5. INSTALLATION
• Position the spreader so that it rests on the spreader pan - do not leave the assembly in this
position for an extended period of time.
• Hoist the spreader assembly to the top of the bin.
• Ensure all 3 hanger brackets are spaced equally around the peak ring - as long as each brack-
et with chain is the same length or number of links, the assembly will be level.
• The hanging height can be adjusted by using all or part of the chain - make adjustments until
the grain entry falls within the inlet funnel and not so high that the roof slope deflects the grain
during operation.
• Using a level, check top surface of the motor 360 degrees around to verify.
• Tighten the U-bolts.
DRILL HOLE THRU
PEAK RING TO SECURE
BRACKETS
Mount the spreader assembly