AGC SMART 30/20 Image Processing Manual Download Page 17

 
 

17 

 

AGC Stopray SMART 

 Processing Guide 

 Version 4.1 

 May 2020  

 

 

 

 

Lamination (*Subject to capability test result

 

Stopray SMART 51/33 can be laminated with coating layer applied against the PVB interlayer in position 
#2.  We highly recommend usage of this configuration in #2 only. AGC  can  assist  its  customers in 
calculating  the  light- and  energy-  characteristics. 

To guarantee the aesthetics and to ensure superior performance, special care must be taken during the 
fabrication  as  described  in  the  previous  sections.  Please  pay  attention  to  the  processing  guide 
instructions for the lamination process. 

In general, the laminated glazing cannot be processed in an industrial atmosphere with a high level of 
humidity. Glazing systems should be designed to prevent de-lamination or corrosion of the  inside coating. 
The processor is responsible for the correct processing of the laminated glazing. 

After the lamination process, products  should be inspected as follows: 
For  durability  of  laminated  glass,  please  refer  to  EN12543-4,  EN12600  and  EN356.  The  correct 
lamination and safety compliance is the responsibility of the processor. 
 
The following points require special attention when using inside laminated coated glass.  

 

 

Stopray SMART 51/33 is a self-matchable product in position 2 of the laminated glass. 
The opto-energetic  performances before and after tempering are similar. 

 

Loss of thermal insulation performance in monolithic (u-Value) 

 

The adhesion test could be slightly lower for the coated side (standard values for pummel are 5.5 and 
4 for uncoated and coated side, respectively) 

 

The interlayer is a clear architectural polyvinyl butyral (pvb) 

 

AGC recommends a number  of tested sealing compounds in a specific document. 

 
Note:  

Recommendations in identifying coating positing in a laminated glass configuration: 
 
Method 1: At the Laminating Line 

 

First, place coated glass with coating facing up; 

 

Second,  place  clear  or  tinted  glass  with  non-Tin  side  facing  UP  by  using  a  Tin  side 
detector; 
 

 

Method 2: Before final packing for delivery or subsequent processing 

 

Ensure the facing of the laminated glass is OK by using the Tin side detector. 

 

 

   

Outcome of the Tin side detector: 

 

a) 

Tin & non-Tin 

 Tin side is coated glass 

 

b) 

Tin & Tin 

 Unable to determine coated glass, 

refer to Method 3.

 

 
 
 
 
 

     Method 3:  

 

When  both  sides  of  Tin  detector  indicate  “Tin”,  inspect  the  glass  edge  through 
transmittance using the background lighting. 

 

Move your vision side to side to have clearer image of the glass transmittance contrast. 

 
 

a) 

Laminated with Clear glass – coated glass will have lower transmittance. 

 

TIN 

Non-

TIN 

Summary of Contents for SMART 30/20

Page 1: ...SMART Processing Guide Version 4 1 May 2020 STOPRAY SMART PROCESSING GUIDE ASIA EDITION Version 4 1 May 2020 SMART 51 33 SMART 30 20 SMART 32T This version of the guide replaces and cancels all previo...

Page 2: ...opray SMART 51 33 which can be laminated with coating against PVB should be installed in Position 2 so that coating layer is embedded within the laminated glazing and thereby protected For more inform...

Page 3: ...11 7 3 Recommendations 12 7 4 Settings 13 7 5 Unloading 14 7 6 Heat Soak test 14 7 7 Quality control 14 7 8 Packaging 15 8 Bending 15 8 1 Curved annealed glass on a concave mould 15 8 2 Curved toughen...

Page 4: ...t handling The glass must be stored on appropriate racks All recommendations given in this Processing Guide shall be strictly followed General comments Clamps slings lifting beams and other handling e...

Page 5: ...the customer s port When protection is needed desiccant bags are fit on the upper side and on the lateral sides of the stack two thirds of the height from the upper corners Once the protective packag...

Page 6: ...lied before lamination process Stopray SMART 51 Laminated against PVB 2 Shipping Stopray SMART 51 Storage in customer s facility up to 9 months Cutting Edge deletion Edge Processing On line washing He...

Page 7: ...The coating around the edge of the glass may be removed during the cutting process provided that dust from grinding is properly removed For ease of detecting if a Stopray SMART is present in a lamina...

Page 8: ...nsible for handling the glass must wear clean gloves suitable for handling coated glass 4 Edge Deletion Tests using different sealants have shown that under strict conditions and with a selection of s...

Page 9: ...nt joint the compatibility of the sealant joint structural joints and weatherseals with the silkscreen enamel paint is under responsibility of the manufacturer of the insulating glazing units and shou...

Page 10: ...AGC Stopray SMART Processing Guide Version 4 1 May 2020 Drawing given for purpose of illustration 6 1 1 Silkscreen not in contact with the sealant joint 6 1 2 Silkscreen in contact with the sealant jo...

Page 11: ...the application Both annealed and heat treated products have similar reflection and transmission The Stopray SMART 32T is NOT self matchable IGU only toughened heat strengthened as needed by the appl...

Page 12: ...r out of the furnace and pumping it back in again re circulation The latest generation of convection furnaces no longer have internal radiation elements They only heat the glass using pre heated air T...

Page 13: ...profile will be adapted to obtain a flat sheet of glass as quickly as possible and to maintain this flatness until the end of the heating process If despite a maximum convection rate the glass retains...

Page 14: ...breakage an additional heat soak test can be carried out in accordance with standard EN 14179 1 or equivalent standards for countries outside the EU AGC highly recommends using electrical equipment G...

Page 15: ...r This is particularly important for glass thicker than 6 mm that will be subject to higher temperatures for a longer period of time The technical values stated cycle times temperatures and so forth w...

Page 16: ...upport The cycle time lasts 15 to 20 minutes and depends largely on the size of the glass and the radius of curvature The lower blow pressure is identical to that used for clear float glass of equal t...

Page 17: ...ide laminated coated glass Stopray SMART 51 33 is a self matchable product in position 2 of the laminated glass The opto energetic performances before and after tempering are similar Loss of thermal i...

Page 18: ...ur own way of identifying the glass coating position kindly enforce it and continue to maintain the good practice Glazing systems should be designed to prevent de lamination or corrosion of the inside...

Page 19: ...al brochure for sealants recommended by AGC AGC recommends indicating the external surface after assembly to ensure that the units are installed correctly Quality control It is essential to check that...

Page 20: ...tion for Stopray SMART products available on www agc tas com describes these conditions Contact AGC Technical Advisory Service for further information aap glass agc com The described instructions must...

Page 21: ...ndations of Section I 2 13 2 To send cut size to another factory If the Stopray SMART coatings have to be delivered from the processing factory to another factory the following recommendations for pac...

Page 22: ...equired tests marking the glass factory production control etc 4 Disclaimer It is the responsibility of the processor to inspect the processed coated glass adequately before and after each step of fab...

Reviews: