Commissioning
PrimoTherm®
EN
6
Commissioning
Prerequisite for commissioning is a complete installation of all hydraulic and
electrical components.
Verify that the thermometer ball valves are fully open.
1. Perform a tightness test as per EN 14336.
2. Verify tightness of the components of the system.
- Adapt the test pressure and the test duration to the corresponding
installation and the corresponding operating pressure.
3. Fill the system with filtered water as per VDI 2035.
4. During filling, verify that all connections are tight.
5. Apply pressure to the system.
6. Vent the system.
7
Operation
During operation, the thermometer ball valves and the ball valves must be
open.
Summary of Contents for PrimoTherm K 180-1
Page 22: ...21 Montage PrimoTherm DE 5 4 1 Stellmotor montieren 45 ...
Page 23: ...22 Montage DE PrimoTherm ...
Page 56: ...21 Mounting PrimoTherm EN 5 4 1 Mounting the actuator 45 ...
Page 57: ...22 Mounting EN PrimoTherm ...
Page 89: ...21 Montage PrimoTherm FR 5 4 1 Montage du servomoteur 45 ...
Page 90: ...22 Montage FR PrimoTherm ...
Page 123: ...21 Montaż PL 5 4 1 Montaż siłownika 45 ...
Page 124: ...22 Montaż PL ...