20
Operation
EN
GAK
6
Operation
For safety reasons, liquid must escape via the discharge line of the safety
valve during heating.
Verify that the safety valve is not shut off.
1. If the safety valve has responded, check the system.
2. Remove the cause before recommissioning the system.
3. Perform a function test of the safety valve (see chapter "Function test
7
Maintenance
7.1
Maintenance intervals
7.2
Maintenance activities
When
Activity
Every 6 months
Perform a function test of the safety valve (see
chapter "Function test safety valve").
WARNING
HOT LIQUID
Water in heating systems can have temperatures of more than 100 °C.
•
Verify that no liquid can escape in an uncontrolled way during maintenance
of the diaphragm expansion vessel.
Failure to follow these instructions can result in death, serious injury or
equipment damage.
Summary of Contents for GAK
Page 13: ...13 Montage DE GAK A Beiliegendes Montagezubehör A GAK Messing A GAK Stahl ...
Page 24: ...24 Anhang DE GAK 13 Anhang 13 1 EU Konformitätserklärung ...
Page 38: ...14 Mounting EN GAK A Enclosed mounting accessories A GAK brass A GAK steel ...
Page 48: ...24 Appendix EN GAK 13 Appendix 13 1 EU Declaration of Conformity ...
Page 62: ...14 Montage FR GAK A Accessoires de montage inclus A GAK laiton A GAK acier ...
Page 72: ...24 Annexe FR GAK 13 Annexe 13 1 Déclaration de conformité UE ...
Page 86: ...14 Montaż PL GAK A dołączony osprzęt montażowy A GAK układ mosiężny A GAK układ stalowy ...
Page 96: ...24 Aneks PL GAK 13 Aneks 13 1 Deklaracja zgodności UE ...