12
Mounting
EN
GAK
5
Mounting
Only mount the product after having completed all pipe assembly work, all
welding work and all soldering work.
1. Flush the lines of the system before installing the product.
If you install the product in an existing system, observe the information in
chapter "Retrofitting the product".
5.1
Preparing mounting
Verify that the nominal pressure of the product corresponds to the speci-
fication value of the system.
Verify that the liquid in the system and the application area of the product
are compatible.
Verify that the product cannot be shut off.
- Do not install shut-off valves, filters or similar equipment.
Verify that the product is mounted in such a way that no external forces
can act on the components after it has been installed.
Verify that the enclosed dowels are suitable for the intended wall.
1. Verify that the wall can carry the product.
Summary of Contents for GAK
Page 13: ...13 Montage DE GAK A Beiliegendes Montagezubehör A GAK Messing A GAK Stahl ...
Page 24: ...24 Anhang DE GAK 13 Anhang 13 1 EU Konformitätserklärung ...
Page 38: ...14 Mounting EN GAK A Enclosed mounting accessories A GAK brass A GAK steel ...
Page 48: ...24 Appendix EN GAK 13 Appendix 13 1 EU Declaration of Conformity ...
Page 62: ...14 Montage FR GAK A Accessoires de montage inclus A GAK laiton A GAK acier ...
Page 72: ...24 Annexe FR GAK 13 Annexe 13 1 Déclaration de conformité UE ...
Page 86: ...14 Montaż PL GAK A dołączony osprzęt montażowy A GAK układ mosiężny A GAK układ stalowy ...
Page 96: ...24 Aneks PL GAK 13 Aneks 13 1 Deklaracja zgodności UE ...