19
Mounting
EN
GAK
5.4
Function test safety valve
1. Provide a container with a sufficient capacity to collect the liquid dis-
charged via the safety valve.
2. Protect all persons from escaping liquid.
3. Open the safety valve by turning the cap.
- Liquid escapes.
- After releasing the cap, no liquid may escape from the safety valve.
5.5
Retrofitting the product
Verify that the nominal pressure of the product corresponds to the speci-
fication value of the system.
Verify that the liquid in the system and the application area of the product
are compatible.
When the system has cooled down and unpressurised, you can mount the
product.
1. If required, drain a part of the system.
2. Flush the lines of the system.
Mount the product as described in chapter "Mounting the product".
WARNING
HOT LIQUID
Water in heating systems is under high pressure and can have temperatures of
more than 100 °C.
•
Verify that the heating water has cooled down before opening the system
and mounting the product.
•
Verify that the system has been unpressurised and drained before mounting
the product.
Failure to follow these instructions can result in death, serious injury or
equipment damage.
Summary of Contents for GAK
Page 13: ...13 Montage DE GAK A Beiliegendes Montagezubehör A GAK Messing A GAK Stahl ...
Page 24: ...24 Anhang DE GAK 13 Anhang 13 1 EU Konformitätserklärung ...
Page 38: ...14 Mounting EN GAK A Enclosed mounting accessories A GAK brass A GAK steel ...
Page 48: ...24 Appendix EN GAK 13 Appendix 13 1 EU Declaration of Conformity ...
Page 62: ...14 Montage FR GAK A Accessoires de montage inclus A GAK laiton A GAK acier ...
Page 72: ...24 Annexe FR GAK 13 Annexe 13 1 Déclaration de conformité UE ...
Page 86: ...14 Montaż PL GAK A dołączony osprzęt montażowy A GAK układ mosiężny A GAK układ stalowy ...
Page 96: ...24 Aneks PL GAK 13 Aneks 13 1 Deklaracja zgodności UE ...