Operation 19
Operation
Power Up
When all the components have been properly mounted and connected, the GS tunnel is
ready to power up and begin production.
Tip!
Before powering up, double-check your installation. Make
a quick inspection to ensure all the components have been
securely mounted and all data and power cables are
properly seated and connected.
To power up the GS Tunnel, plug into power outlet. Push the power switch located on the
front of the controller to the ON (I) position.
Power Switch
2219
Airflow Control
Summary of Contents for GS 100
Page 1: ...GS 75 100 Radial Heat Shrink Tunnel User Guide ...
Page 2: ......
Page 4: ......
Page 20: ...20 Operation Turn on FAN Switch Turn on HEATER Switch 2224 Fan Switch Heater Switch ...
Page 25: ...Operation 25 Lift unit and remove Metal Cage covering the assembly Set aside 2231 Cage ...
Page 34: ...34 Schematics Schematics Wiring Diagram GS Wiring 2225 ...
Page 35: ...Schematics 35 Exploded Diagram 2226 ...
Page 36: ...36 Schematics Exploded Diagram Fan 2239 ...
Page 37: ...Schematics 37 Inside of Power Box 2228 ...
Page 45: ......
Page 46: ......