Photo 17 - O-Ring Placement on Base

 

 
 

18.0

 

PLACING DOME ONTO BASE 

18.01 

Position  front  hanger  bracket  mount  of  dome 

inline  with the  rear  bracket  mount on  the  center-
section  and  slide  the  dome  over  the  assembly. 
Assure that the O-Ring has not slipped and is not 
pinched  when  the  dome  is  seated.  Refer  to 

Figure  12

 

–  Alignment  of  Mounting  Brackets 

and 

Photo 18

 

– Dome Alignment

.  

 

PHOTO 18 - Dome Alignment 

 

 

 

18.02 

Lubricate  the  interior  of  the  V-Band  and  both 

sides  of  the  Base/Dome  flange  lip.  Assemble  V-
Band over front of dome and position over the V-
type  protrusion  and  close  the  V-Band  clamp 
handle. Position handle of the V-Band so that it is 
adjacent  to  the  mounting  tab  of  the  hanger 
bracket. Refer 

to Photo 19 

– V-Band Alignment 

to Base. 

18.03 

Flash  test  the  closure  to 

10  psi  maximum

using  air-valve  at  end  of  dome.  (Do  not  over-
pressurize). 

18.04 

After  pressurizing  closure  to 

10  psi

,  check  for 

leaks  by  using  a  soap  solution  around  all  cable 
seals,  clamps  and  dome  seals.  If  leaks  are 
detected,  increase  tension  on  the  V-Band  bolt 
and  re-test.  Release  pressure  from  closure  after 
testing for leaks. 

 

19.0

 

AERIAL STRAND MOUNTING LG CLOSURES 

19.01 

Using  the  Universal  Offset  Hanger  (OHK) 

bracket, the installed closure may be installed as 
shown  in 

Figure  13

 

–  Aerial  Mounting  of 

LG250. 

 

 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 

Figure 13

 

 
 

 

©2014, AFL. All rights reserved                                                                          PO BOX 3127, Spartanburg, SC 29304  Tel: 1.800.866.397

www.aflglobal.com

 

                                                                                                                                                                          ©2014, AFL. All rights reserved  FC000387 6.13.14                                      

Figure 12 - Alignment of Mounting Brackets

Align Front Bracket

 

  And Rear Bracket

 

Front Bracket

 

      Mount

 

Rear Bracket

 

     Mount

 

              V-Band Clam

 

(Handel in Proper Position)

 

Summary of Contents for LG 250

Page 1: ...8mm Minimum Cable Diameter 0 30 7 6mm Maximum Cable Entry 5 ports Overall Dimensions ht x dia 19 X 8 75 438mm X 222mm 3 0 Contents 3 01 The LG 250 comes with materials to install five 5 cables into po...

Page 2: ...1 Cable entry should start with the selection of one or both of the Express Feeder ports first then with the Drop Lateral ports 5 02 The port closest to the center sections hanger attachment is used f...

Page 3: ...t bag Only remove the cable clamps and grommets from the ports to be occupied by cable Photo 4 Grommet Kit Contents 8 0 USING THE BAND MIC AND LAYER REMOVAL 8 01 Wrap the Band Mic around the cable in...

Page 4: ...2 Position the grommet open and count the number of layers from the center of grommet to be removed Do not include the center core as a layer Carefully tear the layers from the grommet by using a peal...

Page 5: ...arger flanges of the grommets fit in the first and last slots of the cable entry port The ends of the grommets where the layers are visible should now be facing each other The grommets cable access sl...

Page 6: ...es are lined up properly to the appropriate slot Press the cable clamp by hand to assure for proper seating Tighten the cable clamp bolts by alternating in a crossing pattern to lower the cable gradua...

Page 7: ...Use tabbing shears to slit the cable jacket at the ring cut approximately 1 to 1 1 2 inches Then peel on side up from the cable to create a tab See Figure 7 12 02 Place the terminal end onto the grou...

Page 8: ...bundles from the Express Feeder cables or from Drop Lateral cables can be safely routed into the flexible routing clips molded into the sides of the center section frame It is recommended that loose b...

Page 9: ...flexible routing rings to join up with the Express Feeder bundles 14 09 Determine the amount of slack required and mark all bundles Dress slack back towards the storage area Note If the ribbons are to...

Page 10: ...and CSM clamp to assure these are tight 16 02 Apply lubricant to the gasket surfaces of the C Half sections and tighten firmly the four 4 captive hex head bolts Use a 216 style tool or 3 8 socket and...

Page 11: ...efer to Photo 19 V Band Alignment to Base 18 03 Flash test the closure to 10 psi maximum using air valve at end of dome Do not over pressurize 18 04 After pressurizing closure to 10 psi check for leak...

Reviews: