Photo 17 - O-Ring Placement on Base
18.0
PLACING DOME ONTO BASE
18.01
Position front hanger bracket mount of dome
inline with the rear bracket mount on the center-
section and slide the dome over the assembly.
Assure that the O-Ring has not slipped and is not
pinched when the dome is seated. Refer to
Figure 12
– Alignment of Mounting Brackets
and
Photo 18
– Dome Alignment
.
PHOTO 18 - Dome Alignment
18.02
Lubricate the interior of the V-Band and both
sides of the Base/Dome flange lip. Assemble V-
Band over front of dome and position over the V-
type protrusion and close the V-Band clamp
handle. Position handle of the V-Band so that it is
adjacent to the mounting tab of the hanger
bracket. Refer
to Photo 19
– V-Band Alignment
to Base.
18.03
Flash test the closure to
10 psi maximum
,
using air-valve at end of dome. (Do not over-
pressurize).
18.04
After pressurizing closure to
10 psi
, check for
leaks by using a soap solution around all cable
seals, clamps and dome seals. If leaks are
detected, increase tension on the V-Band bolt
and re-test. Release pressure from closure after
testing for leaks.
19.0
AERIAL STRAND MOUNTING LG CLOSURES
19.01
Using the Universal Offset Hanger (OHK)
bracket, the installed closure may be installed as
shown in
Figure 13
– Aerial Mounting of
LG250.
Figure 13
©2014, AFL. All rights reserved PO BOX 3127, Spartanburg, SC 29304 Tel: 1.800.866.3977
©2014, AFL. All rights reserved FC000387 6.13.14
Figure 12 - Alignment of Mounting Brackets
Align Front Bracket
And Rear Bracket
Front Bracket
Mount
Rear Bracket
Mount
V-Band Clam
(Handel in Proper Position)