4
1/4
Power Connection Requirements:
This device is designed to operate using a 24 VAC, 40Va transformer . Transformers supplied with a straight cooling or HVAC
system may be used to power the device but must be verified it’s capable of handling the additional device load prior to
installation . If the system transformer is not capable of handing the extra load, a separate 24 VAC, 40Va transformer
MUST
be used . Do not connect the device to any power source with a voltage less than 22 VAC and a maximum of 32 VAC . Doing
so will cause damage to the device .
NOTE:
Unit requires continuous power . Do not install where power to the unit will be cycled on and off .
1 . Unit should be installed after the air handler in the HVAC system .
2 . The ductwork around the installation area should be clean and dry to
ensure proper adhesion of the gasket materials and any tape used .
3 . When installing near a furnace or heating coils, run the heating system
through five (5) full heating cycles to ensure the temperature of the
Air Scrubber Advanced by Aerus unit does not exceed 200˚F .
4 . An approximate 3 .5” (8 .89 cm) opening will need to be cut into the
existing ductwork to install the unit properly .
Air
Handler
Min . 9” x 9” Metal
Ductwork
Min . 10” x 10”
Fiberglass Ductwork
Max . 15 ft .
3 1/2” Hole Saw
for wood or metal
(recommended)
Drill/Power Driver
Phillips Screwdriver
3/8” Drill Bit
(if installing into
fiberglass ducting
with toggle bolts)
You may also need:
Utility Knife
Tin Snips
(for metal ductwork)
1/4” Nut Driver Bit
Dust Mask
INSTALLATION REQUIREMENTS
CAUTION:
When the unit is installed in a roof mounted HVAC system, the unit must be protected
from elements .
RECOMMENDED INSTALLATION TOOLS
WARNING:
This unit must be installed by a licensed HVAC contractor . Failure to do so will void
warranty of the product .