![Aerotech MPS50SL Hardware Manual Download Page 22](http://html1.mh-extra.com/html/aerotech/mps50sl/mps50sl_hardware-manual_2863036022.webp)
Mechanical Specifications and Installation
MPS50SL Hardware Manual
2.4. Attaching the Payload to the Stage
Aerotech recommends that customers use a representative payload during start-up to prevent accidental
damage to the stage and the payload. Proceed with the electrical installation and test the motion control
system in accordance with the system documentation. Document all results for future reference. For
information on electrical installation refer to
Electrical Specifications and Installation
and the documentation
delivered with the stage.
N O T E :
If your MPS50SL was purchased with Aerotech controls, it might have been tuned with a
representative payload based on the information provided at the time of order. If the MPS50SL is started
up without a payload, the servo gains provided by Aerotech with the shipment may not be appropriate and
servo instability can occur. Refer to the controller help file for tuning assistance.
The payload must be flat, rigid, and comparable to the stage in quality to maintain optimum performance.
N O T E :
For valid system performance, the mounting interface should be flat within 5 µm.
W A R N I N G : Refer to the dimensions in
for maximum allowable thread
engagement. A screw extending through the stage table can affect travel and damage the
stage.
Refer to the dimension drawing in
for mounting hole locations and screw lengths.
Application loads should be symmetrically distributed whenever possible (i.e., the payload should be
centered on the stage table and the entire stage should be centered on the support structure). If cantilevered
loads are applied, refer to
to find the maximum allowable load.
In
, three curves are shown for different loading conditions. The vertical curve, Lv, is for situations
where the stage is mounted in a vertical orientation and the payload is mounted to the table top with its
center of gravity extended outward. If a cantilevered load situation is used, first determine if it is a pitch
cantilever or roll cantilever system based on
. Measure the cantilever length, then find the
corresponding load value from
Figure 2-7:
Load Capability of MPS50SL Series Stages
22
Chapter 2
www.aerotech.com