background image

 

operating manual B100F / B140F 2019-06-27 

12 

4.  Disclaimer (liability, damage) 

 
AeroDesignWorks GmbH cannot supervise a compliance of the rules for 
turbine installation and operation. Therefore, AeroDesignWorks GmbH will 
not assume any liability resulting from damage, loss and costs resulting 
from operation. AeroDesignWorks GmbH is excluded from compensation 
of any kind unless regulated differently by law. This includes injury, death, 
material damage, loss of profit or business, interruption of business and 
other directly or indirectly resulting consequent loss. 
 
Full  liability  is  in  every  case  limited  to  the  sum  paid  for  the  turbine. 
AeroDesignWorks GmbH has not granted any pledge, contract or accord 
in terms of functionality and operation of the model with the turbine. 
 

Set up and operation of the model and the turbine take place under 
full liability and responsibility of the operator. 

Summary of Contents for B100F

Page 1: ...operating manual B100F B140F...

Page 2: ...Directions for safe operation 1 1 General safety instructions 1 2 Warning 1 3 Before starting the turbine 1 4 During operation 1 5 After shut off 2 Mounting of the engine 2 1 Mounting options 2 2 Saf...

Page 3: ...sile loads and temperatures Therefore it cannot be excluded that parts of failing turbine fan wheels and broken fans will strike through the housing which can lead to damage and even injury or death S...

Page 4: ...is device must read this manual especially the instructions for safe operation Furthermore one has to follow the laws and general rules of the avoiding of accidents technical safety as generally valid...

Page 5: ...ngine Really make sure to first inform then buy have the fitting size model for your turbine select servos that are powerful enough construct servo wiring and rudder joints very carefully and reinforc...

Page 6: ...nto the jet exhaust Severe burns can be the result 1 5 After shutting off the engine Place model with the nose facing the wind Wait until the cooling down process is completed Be aware of the cooling...

Page 7: ...led in a way that the area between ignition plug and cerosin plug is in the 12 o clock position see picture This is absolutely vital for a kerosine start of the B100F B140F engine Else the start i e t...

Page 8: ...illustration The optimum size of the fuel tank depends on the model but should be at least 1 7 liters The optimum size for the B100F B140F is 2 3 liters which is enough for an average air time of 6 8...

Page 9: ...perfectly locked in For release push the blue cap in the direction of the metal piece and remove the tube by pulling Now the turbine should be electrically wired to the ECU Connect the turbine via hig...

Page 10: ...8 activate manual point 2 1 Abgleich adjustment trim and throttle back Enter trim forward Enter Throttle forward Enter Sender is now adjusted Make sure that no sender functions like Dual Rate Expo dis...

Page 11: ...controlled with the throttle All parameters necessary for operation are now controlled Failure of the turbine or the system are now excluded Conduct a test run of your turbine and also test the range...

Page 12: ...U features a CODE controlled menu system Every number features an individual menu point From these menu points you have options of changing different pre set parameters This should if at all be done v...

Page 13: ...mpensation of any kind unless regulated differently by law This includes injury death material damage loss of profit or business interruption of business and other directly or indirectly resulting con...

Page 14: ...changed after 10 hours of operation The upstream fine filter between pump and turbine should be cleaned every 5 hours of operation Do this very carefully and make sure no particles will enter the fue...

Page 15: ...faults 24 months from the date of purchase Further liability is excluded Any costs caused by transport and packaging have to be paid by the customer There is no liability of AeroDesignWorks GmbH conce...

Page 16: ...nds acceleration 50 125 000 rpm 1 0 seconds maintenance interval every 50 hours earlier in case of bearing noise or other reasons B140F diameter 99 0 mm length 296 0 mm weight ca 1240 g max thrust 128...

Page 17: ...operating manual B100F B140F 2019 06 27 16 8 System installation plan system installation plan for fuel start...

Page 18: ...ser See technical data fuel consumption Usually 2 3 liter tanks are used with B100F B140F turbines Drill a 6 mm hole in the fuel tank cap of your choice Use the included tank pendulum device and screw...

Page 19: ...body Then secure the Tygon tube connections with wire Again check for leak tightness Braze the battery cable to your chosen battery Red plus black minus We recommend 3s LiPo batteries with max 12V and...

Page 20: ...your model the diameter of the extension pipe and the distance from nozzle to nozzle extension must be correct The shorter the nozzle extension the smaller the loss of power The extension pipe must b...

Page 21: ...B140F 2019 06 27 20 Thank you for your attention Your team of AeroDesignWorks GmbH Wankelstr 57 50996 K ln Tel 49 0 221 984311 50 Fax 49 0 221 984311 02 www aerodesignworks com thrust turbines turbin...

Reviews:

Related manuals for B100F