CONTENTS
Chapter 5 – MODE OF OPERATION
5-1
Para. Subject Page
5.1 Introduction
5-1
5.2
Indoor/Outdoor Reset Mode
5-1
5.3
Constant Setpoint Mode
5-2
5.4
Remote Setpoint Mode
5-2
5.5 Direct
Drive
Modes
5-3
Para.
Subject Page
5.6 Boiler
Management
System
(BMS)
5-4
5.7
Combination Control System
(CCS)
5-5
Chapter 6 – SAFETY DEVICE TESTING PROCEDURES
6-1
Para. Subject Page
6.1
Testing of Safety Devices
6-1
6.2
Low Gas Pressure Fault Test
6-1
6.3
High Gas Pressure Test
6-2
6.4
Low Water Level Fault Test
6-2
6.5
Water Temperature Fault Test
6-2
6.6 Interlock
Tests
6-3
6.7
Flame Fault Test
6-4
Para.
Subject Page
6.8
Air Flow Fault Test
6-4
6.9
SSOV Proof of Closure Switch
6-4
6.10
Purge Switch Open During
Purge
6-5
6.11
Ignition Switch Open During
Ignition
6-5
6.12
Safety Pressure Relief Valve
Test
6-6
Chapter 7 – MAINTENANCE REQUIREMENTS
7-1
Para. Subject Page
7.1 Maintenance
Schedule
7-1
7.2 Spark
Ignitor
7-1
7.3 Flame
Detector
7-2
7.4 Combustion
Calibration
7-2
7.5 Safety
Device
Testing
7-3
7.6 Burner
Assembly
7-3
Para.
Subject Page
7.7
Condensate Drain Trap
7-4
7.8
Shutting the Boiler Down For An
Extended Period of Time
7-4
7.9
Placing The Boiler Back In
Service After A Prolonged
Shutdown
7-4
Chapter 8 – TROUBLESHOOTING GUIDE
8-1
Para. Subject Page
8.1 Introduction
8-1
Para.
Subject Page
ii
Summary of Contents for GF-123
Page 4: ......
Page 8: ......
Page 36: ......
Page 42: ......
Page 68: ......
Page 76: ......
Page 78: ......
Page 84: ......
Page 89: ...APPENDIX F F 5 ...
Page 92: ...APPENDIX F F 8 ...
Page 94: ...APPENDIX F F 10 ...
Page 96: ...APPENDIX F F 12 ...
Page 100: ...APPENDIX G G 4 ...
Page 106: ......
Page 107: ...APPENDIX J BENCHMARK CONTROL PANEL EXPLODED VIEW J 1 ...
Page 108: ...APPENDIX J J 2 P1 P2 P3 P4 P5 P6 BENCHMARK CONTROL PANEL REAR VIEW ...