5 - INSTALLATION - Location
The equipment room MUST be
provided with properly sized openings
to assure adequate combustion air and
proper ventilation.
1. If air is taken directly from outside
the building with no duct, provide two
permanent openings to the equipment
room (see Fig. 5-1)
(a) Combustion air opening, with a
minimum free area of one square
inch per 4000 Btu/hr input (5.5 cm
2
per kW). This opening must be
located within 12” (30 cm) of the
bottom of the enclosure.
(b) Ventilation air opening, with a
minimum free area of one square
inch per 4000 Btu/hr input (5.5 cm
2
per kW). This opening must be
located within 12” (30 cm) of the top
of the enclosure.
2. If combustion and ventilation air is
taken from the outdoors using a duct to
deliver the air to the equipment room,
each of the two openings should be
sized based on a minimum free area
of one square inch per 2000 Btu/hr (11
cm
2
per kW) of input (see Fig. 5-2).
Figure 5-1 Combustion Air direct from outside
Figure 5-2 Combustion Air through Ducts
EQUIPMENT
ROOM
AIR OPENING
AIR OPENING
EQUIPMENT
ROOM
AIR OPENING
AIR OPENING
Summary of Contents for Esteem 399
Page 3: ...3 SAFETY INSTRUCTIONS ...
Page 5: ...5 SAFETY INSTRUCTIONS ...
Page 112: ...112 17 MAINTENANCE ...
Page 116: ...116 19 SPARE PARTS Spare parts ...
Page 135: ......