![Aerco BOILER MANAGEMENT SYSTEM II 5R5-384 Installation, Operation & Maintenance Instructions Manual Download Page 22](http://html.mh-extra.com/html/aerco/boiler-management-system-ii-5r5-384/boiler-management-system-ii-5r5-384_installation-operation-and-maintenance-instructions-manual_2861530022.webp)
INSTALLATION
3. DO NOT terminate the shields to the Ground (
G
) terminal at the Boiler end of the RS485 loop.
Connect the shields of the incoming and outgoing leads together. The RS485 loop shield should only
be terminated at terminal 3 of the BMS II.
4. Activate the BIAS1, BIAS2 and TERM switches on the last boiler in the daisy-chain loop.
5. DO NOT activate the bias switches on the BMS II.
Figure 2-7. RS485 (Modbus) Wiring For Benchmark Series Boilers
2-10
Summary of Contents for BOILER MANAGEMENT SYSTEM II 5R5-384
Page 8: ......
Page 12: ......
Page 16: ...INSTALLATION ...
Page 17: ...INSTALLATION 2 5 ...
Page 21: ...INSTALLATION ...
Page 32: ...OPERATION Figure 3 2 BMS II Menu Structure 3 4 ...
Page 46: ......
Page 64: ......
Page 70: ......
Page 72: ......
Page 73: ...APPENDIX E E 1 APPENDIX E _____________________________ BMS II WIRING DIAGRAM ...
Page 74: ......
Page 76: ......
Page 84: ......
Page 88: ...APPENDIX H H 4 A _ ...
Page 98: ......