MIUM0018_REV06_ QRCE_20180312-MIUM-ENG-AQ AQ_001523_02_0721
12
ENG
•
Position the unit in a point where the condensation discharge may occur easily; give a 3° min slope towards the
point of water discharge; this requirement applies to both horizontal and vertical version.
•
Leave minimum gap spaces as shown on following
figg. 6 and 7
. They are needed for fully accessibility to the
unit in order to carry out all services in safety condition.
Fig. 6
Fig. 7