background image

DISTRIBUTION SYSTEMS AND HOOk-UPS

The following hookup diagrams and connection instructions are for distribution systems sup-
ported by the PEL 105. The instrument must be appropriately configured for the hookup type. 
Most configuration is performed through the PEL Control Panel, as described in the Help. 
Some configuration can also be done via the instrument’s front panel, as described in the user 
manual. Ensure that the current arrow on the sensor is directed towards the load. This ensures 
proper phase angle for power measurements and other phase-sensitive measurements.

Single Phase 2-Wire (1P-2W)

•  VN test lead to neutral (N)
•  VE/GND test lead to ground (optional)
•  V1 test lead to 

L1

•  IN probe to neutral (optional)
•  I1 probe to L1

Single Phase 3-Wire (1P-3W)

•  VN test lead to neutral (N)
•  VE/GND test lead to ground (optional)
•  V1 test lead to L1
•  V2 test lead to L2
•  IN probe to neutral (optional)
•  I1 probe to L1

•  I2 probe to L2

3-Phase 3-Wire 

 (2 current probes) 

(3P-3W

2)

•  VE/GND test lead to ground
•  V1 test lead to L1
•  V2 test lead to L2
•  V3 test lead to L3 
•  I1 probe to LI
•  I3 probe to L3

3-Phase 3-Wire 

 (3 current probes) 

(3P-3W

3)

•  VE/GND test lead to ground
•  V1 test lead to L1
•  V2 test lead to L2
•  V3 test lead to L3
•  I1 probe to L1
•  I2 probe to L2
•  I3 probe to L3

VN

V3

V2

V1

VE/GND

IN

I3

I2

I1

L1
N

Source

Load

VN

V3

Source

Load

V2

V1

VE/GND

IN

I3

I2

I1

L1
N
L2

L2

L1

N

VN

V3

Source

Load

V2

V1

VE/GND

IN

I3

I2

I1

L1
L2
L3

L2

L1

L3

VN

V3

Source

Load

V2

V1

VE/GND

IN

I3

I2

I1

L1
L2
L3

L2

L1

L3

Summary of Contents for PEL 105

Page 1: ...Power Energy Logger Model PEL 105 www aemc com ENGLISH Quick Start Guide...

Page 2: ...nstrument to our repair and calibration facility for a nominal charge The recommended calibration interval for this instrument is 12 months and begins on the date of receipt by the customer For recali...

Page 3: ...lack Test Leads and Alligator Clips Cat 2140 73 Replacement comes in Qty of 1 12 Color coded ID Markers Cat 2140 45 1 5 ft USB Cable Cat 2140 46 4 24 AmpFlex Model A196 24 BK Cat 2140 75 Only Shipped...

Page 4: ...currently running on external AC power OFF Instrument is running on battery or phase power 5 Battery LED Yellow Red ON Steady yellow battery is actively charging Blinking yellow once per second batter...

Page 5: ...every 5 seconds when recording Blinks once every 5 seconds when not recording 12 Control Button Starts or stops a data recording session Enables or disables Bluetooth Enables or disables Wi Fi When p...

Page 6: ...wo seconds and release it when all LEDs light up simultaneously Battery power Press for two seconds and release it when all LEDs light up simultane ously Installing DataView DO NOT CONNECT THE INSTRUM...

Page 7: ...d assistance press the Help button Bluetooth To use this feature to connect to a computer Bluetooth must be enabled on the instrument Check the Bluetooth LED If it is OFF press and hold it down until...

Page 8: ...omputer 2 With the instrument connected open the PEL Control Panel 3 In the menu bar at the top of the screen select Instrument 4 In the drop down menu that appears click the option Add an Instrument...

Page 9: ...in the menu bar and select Configure This opens the Configure dialog box 3 In the General tab click the Set Clock button to display the Date Time dialog box 4 You can synchronize the instrument s cloc...

Page 10: ...through the PEL Control Panel When the LED indicates the SD card is ready you can begin recording To do this through the PEL Control Panel follow the instructions provided in the PEL Control Panel Hel...

Page 11: ...test lead to ground optional V1 test lead to L1 IN probe to neutral optional I1 probe to L1 Single Phase 3 Wire 1P 3W VN test lead to neutral N VE GND test lead to ground optional V1 test lead to L1 V...

Page 12: ...3WO3 VE GND test lead to ground V1 test lead to L1 V2 test lead to L2 V3 test lead to L3 I1 probe to L1 I2 probe to L2 I3 probe to L3 3 Phase 3 Wire Y 3 current probes 3P 3WY3 VE GND test lead to gro...

Page 13: ...Yb VE GND test lead to ground VN test lead to neutral N V1 test lead to L1 IN probe to neutral I1 probe to L1 3 Phase 4 Wire Y 2 Element 3P 4WY2 VE GND test lead to ground VN test lead to neutral N V1...

Page 14: ...Source Load V2 V1 VE GND IN I3 I2 I1 L1 L2 L3 N L1 L2 L3 N VN V3 Source Load V2 V1 VE GND IN I3 I2 I1 L1 L2 L3 N L1 L2 L3 N DC 2 Wire dC 2W VE GND test lead to ground VN test lead to the common conduc...

Page 15: ...the common conductor V1 test lead to conductor 1 V2 test lead to conductor 2 V3 test lead to conductor 3 IN probe to the common conductor I1 probe to conductor 1 I2 probe to conductor 2 I3 probe to co...

Page 16: ...certificate plus recorded calibration data Ship To Chauvin Arnoux Inc d b a AEMC Instruments 15 Faraday Drive Dover NH 03820 USA Phone 800 945 2362 Ext 360 603 749 6434 Ext 360 Fax 603 742 2346 or 60...

Page 17: ...return the instrument to us for repair provided we have your warranty registration on file or a proof of purchase AEMC Instruments will at its option repair or replace the faulty material Warranty Re...

Page 18: ...Notes...

Page 19: ......

Page 20: ...06 18 99 MAN 100428 v4 Chauvin Arnoux Inc d b a AEMC Instruments 15 Faraday Drive Dover NH 03820 USA Phone 603 749 6434 Fax 603 742 2346 www aemc com...

Reviews: