DISTRIBUTION SYSTEMS AND HOOk-UPS
The following hookup diagrams and connection instructions are for distribution systems sup-
ported by the PEL 105. The instrument must be appropriately configured for the hookup type.
Most configuration is performed through the PEL Control Panel, as described in the Help.
Some configuration can also be done via the instrument’s front panel, as described in the user
manual. Ensure that the current arrow on the sensor is directed towards the load. This ensures
proper phase angle for power measurements and other phase-sensitive measurements.
Single Phase 2-Wire (1P-2W)
• VN test lead to neutral (N)
• VE/GND test lead to ground (optional)
• V1 test lead to
L1
• IN probe to neutral (optional)
• I1 probe to L1
Single Phase 3-Wire (1P-3W)
• VN test lead to neutral (N)
• VE/GND test lead to ground (optional)
• V1 test lead to L1
• V2 test lead to L2
• IN probe to neutral (optional)
• I1 probe to L1
• I2 probe to L2
3-Phase 3-Wire
∆
(2 current probes)
(3P-3W
∆
2)
• VE/GND test lead to ground
• V1 test lead to L1
• V2 test lead to L2
• V3 test lead to L3
• I1 probe to LI
• I3 probe to L3
3-Phase 3-Wire
∆
(3 current probes)
(3P-3W
∆
3)
• VE/GND test lead to ground
• V1 test lead to L1
• V2 test lead to L2
• V3 test lead to L3
• I1 probe to L1
• I2 probe to L2
• I3 probe to L3
VN
V3
V2
V1
VE/GND
IN
I3
I2
I1
L1
N
Source
Load
VN
V3
Source
Load
V2
V1
VE/GND
IN
I3
I2
I1
L1
N
L2
L2
L1
N
VN
V3
Source
Load
V2
V1
VE/GND
IN
I3
I2
I1
L1
L2
L3
L2
L1
L3
VN
V3
Source
Load
V2
V1
VE/GND
IN
I3
I2
I1
L1
L2
L3
L2
L1
L3
Summary of Contents for PEL 105
Page 1: ...Power Energy Logger Model PEL 105 www aemc com ENGLISH Quick Start Guide...
Page 18: ...Notes...
Page 19: ......