NTX066 Installation Approval Test Procedure
Rev. 1.00
Aug 10, 2005
Page 5 of 5
ENG-FORM: 634-0101.DOT
CONFIDENTIAL AND PROPRIETARY TO NORTHERN AIRBORNE TECHNOLOGY LTD.
Observations:
5.7
List the power plant, fuel and other electric instruments in Table 5 and note any
anomalies that occur while transmitting. Assess the results.
STEP SYSTEM PASS
FAIL
NOTES
1
Xponder & Encoder
2
ADF 1 & 2
3
VG
4
Compass
5
Directional
Gyro
6
Oil
Pressure
7
Fuel
Pressure
8
Oil
Temp
9
Amps
10
Bus
Voltage
11
Fuel
%
12
Ng
13
TOT
14
Torque
%
15
Annunciators
16
Digital
Clock
Table 5
NOTES:
End of installation approval test procedure