![AEG IST7 User Manual Download Page 46](http://html.mh-extra.com/html/aeg/ist7/ist7_user-manual_14748046.webp)
3 Installation
IST Series UPS (10kVA-200kVA)
User Manual
38
Figure3-15
Structure and installation of the expansion bolts
The expansion tube shouldn’t be higher than the ground, which is to avoid affecting the
installation.
The exposed height of expansion bolt must be within 50mm.
Step 4
Move the UPS from wooden bracket to the ground, and align the bottom installation hole with
the expansion bolt, and screw the bolts.
Step 5
Reinstall the bottom cover plates.
----End
3.4.2 Wiring
IST7 series UPS (10kVA-140kVA)
Step 1
Open the front door of the UPS, remove the bottom wiring cover plate, as shown in Figure3-
16.