38 www.aeg.com
4.5 starting the boiler
step
action
1
Connect the plug of the boiler (3) to the earthed AC wall socket.
CAUTION! Extension cables and multi-plug adapters are not permitted
between the electrical socket and boiling water storage heater
connection.
2
Press the ON/OFF button (5) for min. 0.5 seconds. The white LED
indicator (4) comes on when the boiler starts. Wait until the boiler is
heated. For the 4 litre boiler approximately 15 minutes are necessary to
heat. For the 8 litre boiler approximately 21 minutes are necessary to
heat.
3
Push and hold the button on the boiling water handle (11). Turn the
handle counterclockwise to open the valve. Keep the valve open until
the system is flushed with one boiler fill (4 or 8 litres).
4
Give all user manuals to the end user of the appliance. The appliance is
now fully installed and ready for daily use.
5.1 Important operation information
•
Read and follow all instructions in the SAFETY INFORMATION section.
•
Refer to the separate manuals supplied with the other components for other
relevant information.
•
The amount of boiling water provided is limited by the size of your boiler. When
no boiling water is provided anymore, close the boiling water tap and wait until
the boiler is heated. For the 4 litre boiler approximately 15 minutes are necessary
to heat. For the 8 litre boiler approximately 21 minutes are necessary to heat.
5.
DAILY USE
Summary of Contents for GYB 00416UT
Page 1: ...EN Installation and user manual 26 PROSOURCE GYB 00416UT GYB 00816UT ...
Page 2: ...www aeg com Image 1 Main components of the complete system B E C D A ...
Page 3: ...1 ImagEs 6 7 8 9 10 11 12 4 1 2 3 5 Image 2 Parts description ...
Page 4: ...2 www aeg com 14 13 26 15 20 22 21 23 24 25 17 18 16 19 ...
Page 5: ...3 36 37 38 39 41 40 42 29 31 30 34 27 28 32 33 35 ImagEs ...
Page 6: ...4 www aeg com Image 3 Before installation ...
Page 7: ...5 Image 4 Overview Solo Situation ImagEs ...
Page 8: ...6 www aeg com Image 5 Overview Combi Situation ...
Page 9: ...7 Image 6 The tap Installed ImagEs ...
Page 10: ...8 www aeg com Image 7 The filter installed optional ...
Page 13: ...11 Image 12 Place discharge con nection on siphon ImagEs ...
Page 14: ...12 www aeg com Image 13 Attach discharge connection to siphon Image 14 Connect filter hose ...
Page 15: ...13 Image 15 Connect cold water hose to filter and pressure safety valve ImagEs ...
Page 18: ...16 www aeg com Image 19 Connect boiling water hose boiler to boiling water inlet tap ...
Page 19: ...17 Image 20 Connect boiling water extension hose ImagEs ...
Page 20: ...18 www aeg com Image 21 Connect boiling water inlet tap to mixing valve ...
Page 21: ...19 Image 22 Connect cold water inlet tap to t piece ImagEs ...
Page 22: ...20 www aeg com Image 23 Connect warm water inlet tap to warm water supply ...
Page 23: ...21 Image 24 Connect warm water inlet tap to warm water outlet mixing valve ImagEs ...
Page 24: ...22 www aeg com Image 25 Use boiling water handle PUSH 1 2 ...
Page 25: ...23 Image 26 Use mixing handle 1 Image 27 Use mixing handle 2 OFF ON MIX ImagEs ...
Page 26: ...24 www aeg com Image 28 Built in dimensions 8 3 13 5 12 8 8 3 13 5 20 5 6 8 5 9 ...
Page 27: ...25 5 6 5 5 9 3 15 5 6 6 9 3 15 5 6 6 17 4 5 4 2 ImagEs ...
Page 46: ......
Page 47: ......