36
PD201709 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.1-17 EN
36
Inverter control
Control item
LCD display
Instruction
On/Off control
O n / O f f C t r l
O N
O F F
Control the “On/Off” function through the panel.
Press “ ” and “ ” in the control interface to select the
operation. Press “ENT” to confirm the operation and press
“ESC” to return.
Restart
R e s t a r t
P r e s s E N T t o e x e c u t e .
P r e s s E S C t o c a n c e l .
Restart the inverter through the panel. All settings and
operation record will be saved.
Press “ENT” to confirm restarting: the inverter will begin to
self-inspect; or press “ESC” to return.
Record clear
C l e a r a l l R e c o r d : S u r e
?
P r e s s E N T t o e x e c u t e .
P r e s s E S C t o c a n c e l .
Press “ENT” to confirm clearing all records or press “ESC” to
return.
“Record clear” clears all setting parameters through the
panel, restores the factory settings and saves all history
operation records.
Restore to
factory
R e s t o r e t o F a c t o r y
P r e s s E N T t o e x e c u t e .
P r e s s E S C t o c a n c e l .
“Restore to factory” clears all setting parameters and history
operation records through the panel and restores the factory
setting. Press “ENT” to confirm the operation or press “ESC”
to return.
Table 19: Inverter control