![AEG 80 / 120 kVA Operating Instructions Manual Download Page 34](http://html.mh-extra.com/html/aeg/80-120-kva/80-120-kva_operating-instructions-manual_14744034.webp)
4-1
4.
Installation and Wiring
4-1 Before Installation
Due to different installation environment, we strongly recommend that you read this
manual carefully before installation. Only qualified service personnel can perform
installation and maintenance.
4-2 Package Inspections
External
There are some unpredictable situations that can be possibly encountered during UPS
transportation. Therefore, we recommend that you immediately inspect the container
for any obvious damage or mishandling.
Internal
1. When you unpack the container, immediately examine the UPS or battery pack
cabinet.
2. Check the rating label on the rear side of cabinet. Confirm if the model name and
capacity correctly match your original requirements.
3. Examine if the parts are loose or damaged.
4. Examine any accessory is missing. The Protect 3.M 20 Series has the following
accessory:
-
RS232 cable: 1 pcs (Length= 1.8m)
-
Parallel communication cable: 1 pcs (Length= 2m)
-
Remote EPO - wiring connector: 1 set (2 contact module)
-
Input dry contact - wiring connector: 1 set (4 contact module)
-
Output dry contact – wiring connector: 1 set (12 contact module)
If the following conditions occur:
-
Any damage observed, either external or internal.
-
Any accessory is missing or damaged,
Please immediately contact your dealer or local agent for assistance.