3 Installation
57
Step 2
Take the expansion card and install it on the bypass unit, as shown in Figure3-24.
Figure3-24
Install the expansion card
----End
3.4.4 Battery Release Control Accessory Installation
Ensure that the UPS is completely shutdown before install the battery release control accessory.
The UPS needs to be equipped with function of battery release after ex work, the battery release
accessory needs to be installed on site.
Please contact our customer service for specific routing and installation.
Step 1
Take out the PCB of battery release, then install it in UPS rear with five bolts M4, installation position
as shown in Figure3-25, Figure3-26.
Figure3-25
Installation position of PCB for IST7-60, IST7-100, IST7-120