6
Start Up and Test Procedure / Recommendations
1. Before filling tank, be sure that the tank and the filter bowl are free of packing material and or
construction debris.
2. Check plumbing as it may have become loose from vibrations during shipping.
3. Fill Tank
4. Open isolation valve to system.
5. If there are no leaks verify that the pressure gauge agrees with system pressure. This value may
vary do to connection to Hydronic systems placement.
6. Before applying power to the controller, remove fuse from lower relay enclosure. (There will be two
(2) fuses on dual pump system) Reasoning behind this is, factory settings may not agree with your
system and this gives time for you to set your parameters before applying power to the pump or
pumps.
7. Apply power to your system. Plug it in.
8. Once you are familiar with the controller from either reading the instruction manual or trial and error.
Proceed with setting perimeters that are correct for your hydronic system.